Analisis dan Perbaikan Proses Inspeksi Tabung Cat Untuk Meningkatkan Efisiensi Waktu dengan Metode Lean Six Sigma Di PT Mitramulia Makmur

Bilqis, Delita (2026) Analisis dan Perbaikan Proses Inspeksi Tabung Cat Untuk Meningkatkan Efisiensi Waktu dengan Metode Lean Six Sigma Di PT Mitramulia Makmur. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
22032010009 - cover.pdf

Download (1MB) | Preview
[img]
Preview
Text (Bab 1)
22032010009 - bab1.pdf

Download (309kB) | Preview
[img] Text (Bab 2)
22032010009 - bab2.pdf
Restricted to Repository staff only until 30 April 2029.

Download (845kB)
[img] Text (Bab 3)
22032010009 - bab3.pdf
Restricted to Repository staff only until 30 April 2029.

Download (315kB)
[img] Text (Bab 4)
22032010009 - bab4.pdf
Restricted to Repository staff only until 30 April 2029.

Download (1MB)
[img]
Preview
Text (Bab 5)
22032010009 - bab5.pdf

Download (204kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
22032010009 - daftarpustaka.pdf

Download (193kB) | Preview
[img]
Preview
Text (Lampiran)
22032010009 - lampiran.pdf

Download (3MB) | Preview

Abstract

PT Mitramulia Makmur is a plastic packaging manufacturing company that produces paint tubes for PT Avian. Based on field observations, the 25-liter Avitex Interior paint tube is the product with the highest number of customer complaints, especially related to dent tubes that cause returns, rework, and increased production costs. These problems are influenced by manual dimensional measurement, The position of the tube on the printing machine is not suitable, and waste in the inspection process. This research aims to identify waste, evaluate process performance, and propose improvements using the Lean Six Sigma approach. The methods used include Value Stream Mapping (VSM), Defect Per Million Opportunities (DPMO) analysis and sigma level based on Critical to Quality (CTQ), and Failure Mode and Effects Analysis (FMEA). The VSM results showed a total lead time of 270 minutes, with an average DPMO value of 26,173 and a sigma level of 3.45. The proposed improvements are projected to be able to increase Process Cycle Efficiency (PCE) from 53% to 59%. Further research is recommended to implement and validate the proposed improvement.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorAidil, JoumilNIDN0718036203UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor
T Technology > TS Manufactures
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Delita Delita Bilqis
Date Deposited: 30 Apr 2026 08:10
Last Modified: 30 Apr 2026 08:10
URI: https://repository.upnjatim.ac.id/id/eprint/51442

Actions (login required)

View Item View Item