Kamaliatul, Fajria (2024) Laporan Praktik Kerja Lapangan PT.Semen Indonesia (Persero) Tbk. Pabrik Tuban Section Of Physical Material Quality Assurance. Project Report (Praktek Kerja Lapang dan Magang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (COVER)
COVER PKL FIX.pdf Download (2MB) |
|
|
Text (Bab I)
Bab I - 21031010032.pdf Download (424kB) |
|
|
Text (Bab II)
Bab II - 21031010032.pdf Download (113kB) |
|
|
Text (Bab III)
Bab III - 21031010032.pdf Restricted to Repository staff only until 25 November 2028. Download (551kB) |
|
|
Text (Bab IV)
Bab IV - 21031010032.pdf Restricted to Repository staff only until 25 November 2028. Download (549kB) |
|
|
Text (Bab V)
Bab V- 21031010032.pdf Restricted to Repository staff only until 25 November 2028. Download (136kB) |
|
|
Text (Bab VI - VIII)
Bab VI-VIII - 21031010032.pdf Restricted to Repository staff only until 25 November 2028. Download (298kB) |
|
|
Text (Bab IX)
Bab IX - 21031010032.pdf Download (232kB) |
|
|
Text (Bab X)
Bab X - 21031010032.pdf Download (107kB) |
|
|
Text (Daftar Pustaka)
Daftar Pustaka - 21031010032.pdf Download (109kB) |
|
|
Text (Lampiran)
Lampiran - 21031010032.pdf Download (695kB) |
Abstract
PT Semen Indonesia (Persero) Tbk operates several cement production units with a combined capacity exceeding 13 million tons per year across its Tuban and Gresik plants. The manufacturing process involves sequential stages including mining, crushing, raw material preparation, kiln operation, coal processing, finishing, and packaging. Key raw materials such as limestone, clay, silica sand, and copper slag are supplemented with additives like gypsum, dolomite, and fly ash. To ensure product quality and operational reliability, the company utilizes multiple analytical laboratories and supporting facilities including water treatment, energy supply systems, air utilities, and a wastewater treatment plant (WWTP). These integrated systems enable efficient production while maintaining environmental compliance and consistent quality control.
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | L Education > L Education (General) Q Science > Q Science (General) Q Science > QD Chemistry T Technology > T Technology (General) T Technology > TP Chemical technology T Technology > TP Chemical technology > TP155 Chemical engineering |
||||||||
| Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
| Depositing User: | Kamaliatul Fajria | ||||||||
| Date Deposited: | 01 Apr 2026 03:38 | ||||||||
| Last Modified: | 01 Apr 2026 03:38 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/47007 |
Actions (login required)
![]() |
View Item |
