Faradilla, Amelia Indah (2024) ANALISIS KUALIFIKASI TENAGA KERJA MENGGUNAKAN METODE REOSURCE LEVELING PADA PEKERJAAN STRUKTUR UTAMA GEDUNG BERTINGKAT (STUDI KASUS: PROYEK GEDUNG TWIN TOWER UPN "VETERAN" JAWA TIMUR). Undergraduate thesis, UPN VETERAN JAWA TIMUR.
Text
20035010093-Cover.pdf Download (2MB) |
|
Text (BAB 1)
20035010093-bab1.pdf Download (14kB) |
|
Text (BAB 2)
20035010093-bab2.pdf Restricted to Repository staff only until 17 July 2026. Download (180kB) |
|
Text (BAB 3)
20035010093-bab3.pdf Restricted to Repository staff only until 17 July 2026. Download (272kB) |
|
Text (BAB 4)
20035010093-bab4.pdf Restricted to Repository staff only until 17 July 2026. Download (2MB) |
|
Text (BAB 5)
20035010093-bab5.pdf Download (8kB) |
|
Text (DAFTAR PUSTAKA)
20035010093-daftarpustaka.pdf Download (167kB) |
|
Text (LAMPIRAN)
20035010093-lampiran.pdf Restricted to Repository staff only until 17 July 2026. Download (712kB) |
Abstract
Construction projects related to infrastructure development in Indonesia are an important basis for economic growth because they support mobility, trade, and connectivity between regions. Infrastructure development to encourage the utilization of labor resources in Indonesia. This research aims to analyze the availability of labor in construction projects using the resource leveling method which is used to level needs workforce in the project to avoid over-allocation and ensuring efficiency in construction projects. Additionally, this method can predict project completion time, making it easier for implementers to consider several options before determining the most equitable one optimal. The research results show that before equalization, energy allocation work exceeds the maximum daily limit available. Initial allocation based on qualifications before equalization indicate the maximum number of workers composed from 2 foremen, 1 head carpenter, 1 head blacksmith, 1 head bricklayer, 5 carpenters, 5 ironworkers, 1 bricklayer, and 13 workers. After equalization workforce, the maximum number of workers required is 1 foreman, 1 chief carpenter, 1 chief blacksmith, 1 chief bricklayer, 4 carpenters, 4 blacksmith, 1 bricklayer, and 13 workers.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
Depositing User: | AMELIA INDAH FARADILLA | ||||||||
Date Deposited: | 17 Jul 2024 03:10 | ||||||||
Last Modified: | 17 Jul 2024 03:10 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/26327 |
Actions (login required)
View Item |