Analisis Pengukuran Waktu Kerja Time Study Dan Insentif Kerja Untuk Peningkatan Produksi Upper Sepatu Di CV.Esa Kalen Jaya

Agustin, Putri Olivia (2024) Analisis Pengukuran Waktu Kerja Time Study Dan Insentif Kerja Untuk Peningkatan Produksi Upper Sepatu Di CV.Esa Kalen Jaya. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
Cover.pdf

Download (3MB)
[img] Text (Bab 1)
Bab 1.pdf

Download (223kB)
[img] Text (Bab 2)
Bab 2.pdf
Restricted to Repository staff only until 13 July 2026.

Download (463kB)
[img] Text (Bab 3)
Bab 3.pdf
Restricted to Repository staff only until 13 July 2026.

Download (258kB)
[img] Text (Bab 4)
Bab 4.pdf
Restricted to Repository staff only until 13 July 2026.

Download (365kB)
[img] Text (Bab 5)
Bab 5.pdf

Download (111kB)
[img] Text (Daftar Pustaka)
Daftar Pustaka.pdf

Download (270kB)
[img] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only until 13 July 2026.

Download (520kB)

Abstract

CV.Esa Kalen Jaya is a company that produces semi-finished goods in the form of shoe uppers which is experiencing problems namely not achieving production output targets. It is necessary to measure working time using the Stopwatch time study method to obtain standard time as a standard for completing a work cycle, for all operators in their respective fields. And it was found that the total standard time for eight production elements including fixing and cutting materials, welding and sticking materials, sewing variations, foam backstitching, tongue trap sewing, cutting and burning and quality control was 142.95 seconds/unit. And standard output is 4588.48 units/month. And after increasing the number of working hours from seven hours to eight working hours, the standard output is 5,234 units/month, which means that the production target has been achieved. Increasing employee productivity can also be done through a work incentive program using the piecework plan method so that the results of calculating the incentives that will be given by the company in standard wages are IDR 7,051.41/hour. Based on the calculation results above, the standard wage per unit is IDR 56,411.00/day.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRusindiyanto, RusindiyantoNIDN5994211UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Putri Olivia Agustin
Date Deposited: 17 Jul 2024 02:11
Last Modified: 17 Jul 2024 02:11
URI: https://repository.upnjatim.ac.id/id/eprint/25970

Actions (login required)

View Item View Item