ANALISIS LINE BALANCING MENGGUNAKAN METODE RANKED POSITIONAL WEIGHT (RPW) DAN REGION APPROACH (RA) PADA LINI PRODUKSI BROAD PLATE DI PT. RISA IMPLANTAMA SURABAYA

Rahmantto, Mohammad Rizki (2024) ANALISIS LINE BALANCING MENGGUNAKAN METODE RANKED POSITIONAL WEIGHT (RPW) DAN REGION APPROACH (RA) PADA LINI PRODUKSI BROAD PLATE DI PT. RISA IMPLANTAMA SURABAYA. Undergraduate thesis, UPN "Veteran" Jawa Timur.

[img] Text (COVER)
Cover.pdf

Download (3MB)
[img] Text (BAB 1)
BAB 1 (2).pdf

Download (254kB)
[img] Text (BAB 2)
BAB 2 (1).pdf
Restricted to Repository staff only until 11 December 2027.

Download (442kB) | Request a copy
[img] Text (BAB 3)
BAB 3 (1).pdf
Restricted to Repository staff only until 11 December 2027.

Download (31kB) | Request a copy
[img] Text (BAB 4)
BAB 4 (1).pdf
Restricted to Repository staff only until 11 December 2027.

Download (633kB) | Request a copy
[img] Text (BAB 5)
BAB 5 (1).pdf

Download (9kB)
[img] Text (DAFTAR PUSTAKA)
DAFPUS (1).pdf

Download (129kB)
[img] Text (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (187kB) | Request a copy

Abstract

PT. Risa Implantama is a company engaged in the production of bone implants that focuses on the production of bone pins and screws. This company produces bone pins with various types and then markets the production results through distributors and also produces goods according to incoming orders, both from distributors and hospitals. Rapid advances in medical science and technology have significantly improved the quality and longevity of human life. The field of orthopedics in the world of medicine has also experienced technological advances in dealing with various cases in its field, one of which is bone fractures. Based on initial calculations, the line efficiency was 53.05%, then the balance delay was 46.95% and the idle time was 45.08 minutes. After processing the data using the ranked positional weight method for the line efficiency of the broad plate production process, the line efficiency results were 50.94%, then the balance delay was 44.23% and the idle time was 40.40 minutes. Furthermore, after data processing using the region approach method for the line efficiency of the broad plate production process, the line efficiency results were 56.59%, then for the balance delay of 43.41% and idle time of 39.08 minutes. Based on the calculation results, the Region Approach (RA) method is the optimal method in solving line balancing, because it has the highest Line Efficiency (LE) value and the lowest Balance Delay (BD).

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorWidjajati, Endang PujiNIDN0728126002endang.ti@upnjatim.ac.id
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic Planning
H Social Sciences > HD Industries. Land use. Labor > HD62.15 Total Quality Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Mohammad Rizki Rahmantto
Date Deposited: 12 Dec 2024 04:33
Last Modified: 12 Dec 2024 04:33
URI: https://repository.upnjatim.ac.id/id/eprint/32864

Actions (login required)

View Item View Item