Pabrik Asetanilida Dari Anilin dan Asam Asetat Dengan Proses Asetilasi Kapasitas 60.000 Ton/Tahun

Febrianti, Amanah Nur (2024) Pabrik Asetanilida Dari Anilin dan Asam Asetat Dengan Proses Asetilasi Kapasitas 60.000 Ton/Tahun. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
19031010004.-cover.pdf

Download (1MB)
[img] Text (Bab 1)
19031010004.-bab 1.pdf

Download (365kB)
[img] Text (Bab 2)
19031010004.-bab 2.pdf

Download (258kB)
[img] Text (Bab 3)
19031010004.-bab 3.pdf
Restricted to Registered users only until 18 April 2027.

Download (223kB)
[img] Text (Bab 4)
19031010004.-bab 4.pdf
Restricted to Registered users only until 18 April 2027.

Download (259kB)
[img] Text (Bab 5)
19031010004.-bab 5.pdf
Restricted to Registered users only until 18 April 2027.

Download (395kB)
[img] Text (Bab 6)
19031010004.-bab 6.pdf
Restricted to Registered users only until 18 April 2027.

Download (434kB)
[img] Text (Bab 7)
19031010004.-bab 7.pdf
Restricted to Registered users only until 18 April 2027.

Download (2MB)
[img] Text (Bab 8)
19031010004.-bab 8.pdf
Restricted to Registered users only until 18 April 2027.

Download (370kB)
[img] Text (Bab 9)
19031010004.-bab 9.pdf
Restricted to Registered users only until 18 April 2027.

Download (447kB)
[img] Text (Bab 10)
19031010004.-bab 10.pdf
Restricted to Registered users only until 18 April 2027.

Download (349kB)
[img] Text (Bab 11)
19031010004.-bab 11.pdf
Restricted to Registered users only until 18 April 2027.

Download (102kB)
[img] Text (Daftar Pustaka)
19031010004.-daftar pustaka.pdf

Download (307kB)
[img] Text (Flowsheet)
19031010004.-flowsheet.pdf

Download (267kB)
[img] Text (Lampiran)
19031010004.-lampiran.pdf
Restricted to Registered users only until 18 April 2027.

Download (2MB)

Abstract

An acetanilide plant from aniline and acetic acid with an acetylation process with a capacity of 60,000 tons/year will be established in Karanganyar Beluk Kidul Industrial Estate, Sroyo, Jaten District, Karanganyar Regency, Central Java. The main raw material is aniline obtained from PT Mitra Tsalasa Jaya South Tangerang and the second material is acetic acid obtained from PT Indo Acidatama Tbk Karang Anyar, Central Java and the third raw material is activated carbon obtained from PT Javaindo Purestar Carbon Mojokerto, East Java. The manufacture of acetanilide by acetylation process is first aniline and acetic acid (100% excess) heated to a temperature of 150⁰C fed to the reactor. The reaction runs under operating conditions at 150⁰C with a pressure of 1 atm and a reaction time of 6 hours. This reaction produces two products. The top product is acetic acid vapor and water. The bottom product of the reactor is fed to the cooler to a temperature of 80⁰C and enters the decolorizer tank for the purification process (blanching) by adding active carbon. The results of the decolorizer process are fed to the rotary drum vacuum filter to be separated between the asetanilide solution and activated carbon. The asetanilide solution that is already clean from activated carbon is then fed to the crystallizer to be crystallized. After the crystallization process, the mixture of crystals and mother liquor is fed to a centrifuge. Asetanilide crystals are fed to rotary dryer for drying process. Asetanilide crystals from the rotary dryer and cyclone are fed to the cooling conveyor to cool to 32⁰C and fed to the ball mill to be crushed and uniformed in size to 100 mesh. Asetanilide crystals that have been uniform in size are then fed to the asetanilide silo. The provisions for the establishment of the planned acetanilide plant can be summarized as follows: Capacity: 60,000 Ton/Year Form of company: Limited Liability Company (PT) Organization system: Line and Staff Factory location: Karang Anyar, Central Java Land area: 22,825 m2 Operation system: Continuous Operation Time: 330 days/year, 24 hours/day Number of employees: 220 people Materials used: Aniline, Acetic Acid, and Activated Carbon Economic analysis Construction period: 2 years Plant life: 10 years Fixed Capital Investment (FCI): Rp. 692,065,537,141 Working Capital Investment (WCI): Rp. 603,685,945,426 Total Capital Investment (TCI): Rp. 1,295,751,482,568 Raw materials (1 year) : Rp. 1,776,607,906,507 Utility cost (1 year) : Rp. 120,479,587,574 Total Production Cost (TPC) : Rp. 2,414,743,781,704 Bank interest : 8% Return Of Investment Before Tax : 23.14% Return Of Investment After Tax : 17.35% Internal Rate Of Return (IRR): 11.1% Pay Back Period (PBP) : 3 years 10 months Break Event Point (BEP): 30,24%

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRedjeki, SriNIDN0714035701UNSPECIFIED
Subjects: T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Amanah Nur Febrianti
Date Deposited: 18 Apr 2024 07:54
Last Modified: 18 Apr 2024 07:54
URI: https://repository.upnjatim.ac.id/id/eprint/21772

Actions (login required)

View Item View Item