Analisis Resiko Keselamatan Kerja Metode National Aeronautics Space Administrations Task Loading Index (NASA-TLX) Bagian Produksi Pabrik Minyak Kayu Putih (PMKP) Kupang, Mojokerto

Al Firdaus, Rizki Aziz (2022) Analisis Resiko Keselamatan Kerja Metode National Aeronautics Space Administrations Task Loading Index (NASA-TLX) Bagian Produksi Pabrik Minyak Kayu Putih (PMKP) Kupang, Mojokerto. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
17034010046-cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (Bab 1)
17034010046-bab 1.pdf

Download (20kB) | Preview
[img]
Preview
Text (Bab 2)
17034010046-Bab 2.pdf

Download (220kB) | Preview
[img] Text (Bab 3)
17034010046-bab 3.pdf
Restricted to Registered users only until 17 January 2024.

Download (135kB)
[img] Text (Bab 4)
17034010046-bab 4.pdf
Restricted to Registered users only until 17 January 2024.

Download (211kB)
[img]
Preview
Text (Bab 5)
17034010046-bab 5.pdf

Download (10kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
17034010046-Daftarpustaka.pdf

Download (46kB) | Preview
[img] Text (Lampiran)
17034010046-Lampiran.pdf
Restricted to Registered users only until 17 January 2024.

Download (894kB)

Abstract

PMKP Kupang is a Eucalyptus oil manufacturing factory that has been operating in Mojokerto Regency and is owned by Perum Perhutani. When doing their work, production employees get high enough of pressure so that the mental workload of employees increases. Therefore, it is necessary to analyze the risk of mental workload experienced by employees and the factors that influence it. So that PMKP Kupang can determine the right steps to fix this. The method used in this research is NASA-TLX which is a method to find out how much mental workload is. From the result of the NASA-TLX calculation, the workload value of all employees is 80.6 (very high) with the largest mental workload indicator in PMKP Kupang is the Effort (EF) factor of 270.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorHidayah, Euis NurulNIDN0723107701UNSPECIFIED
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Rizki Aziz Al Firdaus
Date Deposited: 18 Jan 2022 01:48
Last Modified: 18 Jan 2022 01:48
URI: http://repository.upnjatim.ac.id/id/eprint/4326

Actions (login required)

View Item View Item