Pabrik Propilen dari Propana dengan Proses Dehidrogenasi dengan Kapasitas 65.000 Ton/Tahun

Putri, Hanifah Aji Irsya Putri (2026) Pabrik Propilen dari Propana dengan Proses Dehidrogenasi dengan Kapasitas 65.000 Ton/Tahun. Undergraduate thesis, UPN “VETERAN” JAWA TIMUR.

[img] Text (Cover)
Cover .pdf

Download (1MB)
[img] Text (Bab 1)
BAB 1.pdf

Download (853kB)
[img] Text (Bab 2)
BAB 2.pdf

Download (733kB)
[img] Text (Bab 3)
bab 3.pdf
Restricted to Repository staff only until 22 July 2029.

Download (437kB)
[img] Text (Bab 4)
BAB 4 .pdf
Restricted to Repository staff only until 22 July 2029.

Download (457kB)
[img] Text (Bab 5)
bab 5.pdf
Restricted to Repository staff only until 22 July 2029.

Download (648kB)
[img] Text (Bab 6)
bab 6.pdf
Restricted to Repository staff only until 22 July 2029.

Download (485kB)
[img] Text (Bab 7)
BAB 7.pdf
Restricted to Repository staff only until 22 July 2029.

Download (1MB)
[img] Text (Bab 8)
BAB 8.pdf
Restricted to Repository staff only until 22 July 2029.

Download (875kB)
[img] Text (Bab 9)
BAB 9.pdf
Restricted to Repository staff only until 22 July 2029.

Download (618kB)
[img] Text (Bab 10)
bab 10.pdf
Restricted to Repository staff only until 22 July 2029.

Download (637kB)
[img] Text (Bab 11)
BAB 11.pdf
Restricted to Repository staff only until 22 July 2029.

Download (401kB)
[img] Text (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (529kB)
[img] Text (Flowsheet)
PFD PROSES DAN UTILITAS.pdf

Download (650kB)

Abstract

A propylene plant with a production capacity of 65,000 tons/year is planned to be established in Purwakarta District, Cilegon City, Banten Province. The plant will operate continuously for 24 hours per day and 330 days per year. The main raw material, propane, will be supplied by the Tanjung Sekong LPG Terminal of PT Pertamina Patra Niaga, while the aluminum oxide (Al₂O₃) catalyst will be provided by PT Satir Material Indonesia. The production process employs propane dehydrogenation, in which propane is converted into propylene and hydrogen in the gas phase. The reactor effluent is subsequently directed to a flash drum to separate hydrogen gas from the hydrocarbon components. The bottom stream from the flash drum is then fed to a distillation column to produce high-purity propylene (99.9 wt%) as the main product, while the remaining hydrocarbons are obtained as by-products. The establishment of this plant is expected to support the domestic petrochemical industry by meeting the increasing demand for propylene as a raw material for plastics and polymer production. In addition, the plant is anticipated to reduce Indonesia’s dependence on imported propylene and contribute to the growth and competitiveness of the national petrochemical sector.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPujiastuti, CaeciliaNIDN0005036311caecilia.tk@upnjatim.ac.id
Subjects: T Technology > TP Chemical technology
T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Hanifah Aji Irsya Putri
Date Deposited: 23 Jul 2026 04:19
Last Modified: 23 Jul 2026 04:35
URI: https://repository.upnjatim.ac.id/id/eprint/57704

Actions (login required)

View Item View Item