Islamey, Tarisa Audina (2026) Analisis Pemborosan Pada Produksi Minuman Kemasan Dengan Metode Lean Manufacturing Dan Rekomendasi Perbaikan Dengan FMEA di PT XYZ. Undergraduate thesis, UPN Veteran Jawa Timur.
This is the latest version of this item.
|
Text (COVER)
22032010077-Cover.pdf Download (1MB) | Preview |
|
|
Text (BAB 1)
22032010077-Bab1.pdf Download (565kB) | Preview |
|
|
Text (BAB 2)
22032010077-Bab2.pdf Restricted to Repository staff only until 26 May 2029. Download (1MB) |
||
|
Text (BAB 3)
22032010077-Bab3.pdf Restricted to Repository staff only until 26 May 2029. Download (626kB) |
||
|
Text (BAB 4)
22032010077-Bab4.pdf Restricted to Repository staff only until 26 May 2029. Download (1MB) |
||
|
Text (BAB 5)
22032010077-Bab5.pdf Download (352kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
22032010077-Daftarpustaka.pdf Download (355kB) | Preview |
|
|
Text (LAMPIRAN)
22032010077-Lampiran.pdf Restricted to Repository staff only until 26 May 2029. Download (1MB) |
Abstract
The packaged beverage industry is experiencing rapid growth in response to demand. This research aims to identify, analyze, and minimize various types of waste in the production process of packaged beverages at PT XYZ using a Lean Manufacturing approach that integrates Value Stream Mapping (VSM), Process Activity Mapping (PAM), and Failure Mode and Effect Analysis (FMEA). Waste weighting analysis showed that unnecessary motion was the most critical waste with the highest weight of 4.71, followed by waiting with a weight of 4.14, overprocessing with a weight of 3.86, overproduction with a weight of 3.57, excessive motion with a weight of 2.86 and excess inventory with a weight of 2.57. Mapping the current state process using VSM with the help of PAM tools succeeded in minimizing the initial lead time from 687 minutes to 568 minutes by reducing the process time. The implementation of improvement proposals that include the implementation of visual control with work standardization, as well as the integration of information systems and quality control resulted in an increase in Process Cycle Efficiency (PCE) from 25% to 30%. This study proves that the integration of Lean Manufacturing with PAM and improvement recommendations with FMEA is effective in reducing waste, shortening lead time, and improving the efficiency of the packaged beverage production process in a sustainable manner. Keywords: Lean Manufacturing, Production Process Efficiency, Waste
| Item Type: | Thesis (Undergraduate) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > T Technology (General) T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering T Technology > TS Manufactures T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | tarisa audina islamey | ||||||||
| Date Deposited: | 29 May 2026 06:14 | ||||||||
| Last Modified: | 29 May 2026 06:14 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/53184 |
Available Versions of this Item
- Analisis Pemborosan Pada Produksi Minuman Kemasan Dengan Metode Lean Manufacturing Dan Rekomendasi Perbaikan Dengan FMEA di PT XYZ. (deposited 29 May 2026 06:14) [Currently Displayed]
Actions (login required)
![]() |
View Item |
