Analisis Pemborosan Pada Proses Aktivitas Gudang Sparepart Menggunakan Metode Lean Warehousing di PT XYZ

Salsabila, Anastasya Eka Putri (2026) Analisis Pemborosan Pada Proses Aktivitas Gudang Sparepart Menggunakan Metode Lean Warehousing di PT XYZ. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
22032010065-cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (BAB I)
22032010065-bab 1.pdf

Download (193kB) | Preview
[img] Text (BAB II)
22032010065-bab2.pdf
Restricted to Repository staff only until 30 April 2028.

Download (538kB)
[img] Text (BAB III)
22032010065-bab3.pdf
Restricted to Repository staff only until 30 April 2028.

Download (202kB)
[img] Text (BAB IV)
22032010065-bab4.pdf
Restricted to Repository staff only until 30 April 2028.

Download (650kB)
[img]
Preview
Text (BAB V)
22032010065-bab5.pdf

Download (162kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
22032010065-daftar pustaka.pdf

Download (196kB) | Preview
[img] Text (Lampiran)
22032010065-lampiran.pdf
Restricted to Repository staff only

Download (610kB)

Abstract

PT ABC Utility Company is a subsidiary of PT ABC Company, which provides utility services to companies under the auspices of PT ABC. In its operations, PT ABC Utility Company requires spare parts for maintenance and repair of utility machines. The large number of spare parts required increases the complexity of warehouse operations. This complexity can lead to waste and potentially reduce the effectiveness and efficiency of the warehouse flow. Therefore, this study was conducted to identify waste in the spare parts warehouse process using the lean warehousing method through value stream mapping and to provide recommendations for improvements to reduce waste through root cause analysis (RCA). The analysis revealed that 31 warehouse flow activities with a total lead time of 247 minutes decreased to 24 activities with a total lead time of 172 minutes after the proposed improvements to the spare parts warehouse flow activities.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRr, RochmoeljatiNIDN0729106102UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Anastasya Salsabila
Date Deposited: 30 Apr 2026 04:04
Last Modified: 30 Apr 2026 04:40
URI: https://repository.upnjatim.ac.id/id/eprint/51427

Actions (login required)

View Item View Item