Triwardani, Agil ANALISIS PENYEBAB KETERLAMBATAN PEKERJAAN REPLATING LAMBUNG PADA PROYEK KAPAL FC AVANT GARDE MENGGUNAKAN METODE FAULT TREE ANALYSIS. Project Report (Praktek Kerja Lapang dan Magang). Universitas Pembangunan Nasional "Veteran" Jawa Timur. (Unpublished)
|
Text (Cover)
22032010110-cover.pdf Download (938kB) | Preview |
|
|
Text (Bab 1)
22032010110-bab 1.pdf Download (187kB) | Preview |
|
|
Text (Bab 2)
22032010110-bab 2.pdf Restricted to Repository staff only until 29 April 2029. Download (391kB) |
||
|
Text (Bab 3)
22032010110-bab 3.pdf Restricted to Repository staff only until 29 April 2029. Download (377kB) |
||
|
Text (Bab 4)
22032010110-bab 4.pdf Restricted to Repository staff only until 29 April 2029. Download (180kB) |
||
|
Text (Bab 5)
22032010110-bab 5.pdf Download (175kB) | Preview |
|
|
Text (Daftar Pustaka)
22032010110-daftarpustaka.pdf Download (175kB) | Preview |
|
|
Text (Lampiran)
22032010110-lampiran.pdf Download (287kB) | Preview |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | H Social Sciences > HE Transportation and Communications T Technology > T Technology (General) V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Agil Triwardani | ||||||||
| Date Deposited: | 29 Apr 2026 07:36 | ||||||||
| Last Modified: | 29 Apr 2026 07:36 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/51287 |
Actions (login required)
![]() |
View Item |
