PENERAPAN METODE JUST-IN-TIME TERHADAP PROYEK CONVEYOR CANGKANG SAWIT PADA PT. BERKAH ANUGERAH INTI SEMESTA

Ramadhan, Regan Fitra (2025) PENERAPAN METODE JUST-IN-TIME TERHADAP PROYEK CONVEYOR CANGKANG SAWIT PADA PT. BERKAH ANUGERAH INTI SEMESTA. Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.

[img] Text (Cover)
21032010139-cover...pdf

Download (380kB)
[img] Text (Bab 1)
21032010139-bab1.pdf

Download (202kB)
[img] Text (Bab 2)
21032010139-bab2.pdf
Restricted to Repository staff only until 4 December 2028.

Download (371kB) | Request a copy
[img] Text (Bab 3)
21032010139-bab3.pdf
Restricted to Repository staff only until 4 December 2028.

Download (1MB) | Request a copy
[img] Text (Bab 4)
21032010139-bab4.pdf

Download (193kB)
[img] Text (Bab 5)
21032010139-bab5.pdf

Download (193kB)
[img] Text (Daftar Pustaka)
21032010139-daftarpustaka.pdf

Download (192kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRochmoeljati, RoroNIDN0729106102rochmoeljati@gmail.com
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Regan Fitra Ramadhan
Date Deposited: 23 Dec 2025 07:02
Last Modified: 23 Dec 2025 07:44
URI: https://repository.upnjatim.ac.id/id/eprint/47949

Actions (login required)

View Item View Item