Pra Rancangan Pabrik Asam Nitrat Dari Amonia dan Udara Dengan Proses Ostwald Kapasitas 75.000 Ton/Tahun

Agung, M Arip Pancar (2025) Pra Rancangan Pabrik Asam Nitrat Dari Amonia dan Udara Dengan Proses Ostwald Kapasitas 75.000 Ton/Tahun. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (COVER)
COVER TA.pdf

Download (944kB)
[img] Text (BAB I)
BAB 1.pdf

Download (351kB)
[img] Text (BAB II)
BAB 2.pdf

Download (388kB)
[img] Text (BAB III)
BAB 3.pdf
Restricted to Repository staff only until 3 November 2028.

Download (279kB)
[img] Text (BAB IV)
BAB 4.pdf
Restricted to Repository staff only until 3 November 2028.

Download (291kB)
[img] Text (BAB V)
BAB 5.pdf
Restricted to Repository staff only until 3 November 2028.

Download (563kB)
[img] Text (BAB VI)
BAB 6.pdf
Restricted to Repository staff only until 3 November 2028.

Download (234kB)
[img] Text (BAB VII)
BAB 7.pdf
Restricted to Repository staff only until 3 November 2028.

Download (1MB)
[img] Text (BAB VIII-XI)
BAB 8-11.pdf
Restricted to Repository staff only until 3 November 2028.

Download (1MB)
[img] Text (Daftar Pustaka)
DAFPUS.pdf

Download (229kB)
[img] Text (Lampiran)
APPENDIX.pdf
Restricted to Repository staff only until 3 November 2028.

Download (3MB)
[img] Text (Flowsheet)
FLOWSHEET PABRIK ASAM NITRAT DAN UTILITAS.pdf

Download (408kB)
Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSani, Sani0712046303sani.tk@upnjatim.ac.id
Subjects: T Technology > TP Chemical technology
T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Mochammad Arip Pancar Agung
Date Deposited: 04 Nov 2025 02:39
Last Modified: 04 Nov 2025 02:39
URI: https://repository.upnjatim.ac.id/id/eprint/45951

Actions (login required)

View Item View Item