Praktik Kerja Lapangan PT. Semen Gresik Tbk. (Semen Indonesia Group) Unit Finish Mill Pabrik Rembang- Jawa Tengah

Rifki, M.Bagas Ikmal (2025) Praktik Kerja Lapangan PT. Semen Gresik Tbk. (Semen Indonesia Group) Unit Finish Mill Pabrik Rembang- Jawa Tengah. Project Report (Praktek Kerja Lapang dan Magang). UPN Veteran Jawa Timur, Surabaya. (Unpublished)

This is the latest version of this item.

[img] Text (COVER, LEMBAR PENGESAHAN, KATA PENGANTAR)
21031010205_COVER, LEMBAR PENGESAHAN , KATA PENGANTAR PKL.pdf

Download (579kB)
[img] Text (BAB I PENDAHULUAN)
21031010205_BAB I PENDAHULUAN PKL.pdf

Download (818kB)
[img] Text (BAB II TINJAUAN PUSTAKA)
21031010205_BAB II TINJAUAN PUSTAKA PKL.pdf
Restricted to Repository staff only

Download (307kB)
[img] Text (BAB III PROSES PRODUKSI)
21031010205_BAB III PROSES PRODUKSI.pdf
Restricted to Repository staff only

Download (184kB)
[img] Text (BAB IV SPESIFIKASI ALAT)
21031010205_BAB IV SPESIFIKASI ALAT.pdf
Restricted to Repository staff only

Download (781kB)
[img] Text (BAB V LABORATORIUM)
21031010205_BAB V LABORATORIUM.pdf

Download (318kB)
[img] Text (BAB VI, VII, VII( UTILITAS, KESELAMATAN DAN KESEHATAN KERJA, UNIT PENGOLAHAN LIMBAH))
21031010205_BAB VI, VII, VII( UTILITAS, KESELAMATAN DAN KESEHATAN KERJA, UNIT PENGOLAHAN LIMBAH).pdf

Download (715kB)
[img] Text (BAB IX TUGAS KHUSUS)
21031010205_BAB IX TUGAS KHUSUS.pdf

Download (502kB)
[img] Text (BAB X KESIMPULAN SARAN)
21031010205_BAB X KESIMPULAN DAN SARAN.pdf

Download (157kB)
[img] Text (DAFTAR PUSTAKA)
21031010205_DAFTAR PUSTAKA PKL.pdf

Download (156kB)
[img] Text (LAMPIRAN FOTO SAYA DAN DATA PKL)
21031010205_LAMPIRAN FOTO KEGIATAN SAYA DAN DATA PKL.pdf

Download (929kB)

Abstract

The Gresik Cement Factory was inaugurated in Gresik by the first President of the Republic of Indonesia, Mr. Ir. Soekarno, on August 7, 1957. PT Semen Gresik has factories located in Gresik Regency, Tuban City, and Rembang City. However, currently, the factory in Gresik is no longer fully operated and only consists of a finish mill. The Gresik Rembang Cement Factory only started operating in July 2018 with a capacity of 3 million tons/year. This location is 26 km from Rembang City, 51 km from Rembang Port, 97 km from Tuban Pelsus Port, 147 km from Semarang City, and 247 km from Surabaya City. The Finish Mill Unit at PT Semen Gresik is responsible for the planning, coordination, implementation, and evaluation of finish mill machine operations. In this unit, a series of processes are carried out including grinding, drying, separating, and transporting. The final grinding process and mixing of semi-finished materials, in the form of clinker, with various additional materials, such as gypsum, trass, fly ash, and limestone. The finish mill is used for grinding and mixing clinker and gypsum to obtain a milled product with the desired fineness, known as cement. The use of CNG as a replacement for hot gas from the kiln at PT Semen Gresik significantly contributes to reducing energy consumption in cement production. The exit temperature also affects the amount of CNG required. Calculations show that reducing the exit temperature by 20°C will save Rp 897,172,209 in CNG expenses.

Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPerwitasari, Dyah SuciNIP19661130 199203 2 001saridyah05@gmail.com
Subjects: L Education > L Education (General)
Q Science > Q Science (General)
Q Science > QD Chemistry
T Technology > T Technology (General)
T Technology > TP Chemical technology
T Technology > TP Chemical technology > TP155 Chemical engineering
T Technology > TP Chemical technology > TP368 Food processing and manufacture
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Muhammad Bagas Ikmal R
Date Deposited: 16 Sep 2025 07:08
Last Modified: 16 Sep 2025 07:08
URI: https://repository.upnjatim.ac.id/id/eprint/43638

Available Versions of this Item

Actions (login required)

View Item View Item