Rahyang Niskala, Wastu Kencana (2025) Analisa Manajemen Risiko pada Proses Panen Kelapa Sawit dengan Menggunakan Metode Mix Method (Studi Kasus di PT XYZ Kalimantan Selatan). Undergraduate thesis, UPN "Veteran" Jawa Timur.
![]() |
Text (Cover)
Skripsi_Cover.pdf Download (3MB) |
![]() |
Text (Bab 1)
Skripsi_Bab 1.pdf Download (124kB) |
![]() |
Text (Bab 2)
Skripsi_Bab 2.pdf Restricted to Repository staff only until 31 December 2030. Download (290kB) |
![]() |
Text (Bab 3)
Skripsi_Bab 3.pdf Restricted to Repository staff only until 31 December 2030. Download (149kB) |
![]() |
Text (Bab 4)
Skripsi_Bab 4.pdf Restricted to Repository staff only until 31 December 2030. Download (395kB) |
![]() |
Text (Bab 5)
Skripsi_Bab 5.pdf Download (109kB) |
![]() |
Text (Daftar Pustaka)
Skripsi_Daftar Pustaka.pdf Download (128kB) |
![]() |
Text (Lampiran)
Skripsi_Lampiran.pdf Restricted to Repository staff only Download (1MB) |
Abstract
The harvesting process in oil palm plantations is one of the critical stages that affect productivity. XYZ Company is a business group engaged in various sectors. XYZ Company has various subsidiaries operating under the XYZ brand. The company continues to strive to control and mitigate risks in every part of the company, especially in the harvesting process in oil palm plantations. The current problem is the risks that arise in the harvesting process in oil palm plantations, both from operational risks, environmental risks, and human resource risks that can impact the harvesting process. This study aims to identify the types of risks in the oil palm harvesting process at XYZ Company South Kalimantan, determine the dominant risk levels in the oil palm harvesting process and determine the appropriate improvement proposals using a mixed method, which combines qualitative and quantitative techniques. The results of the study indicate that there are three levels of risk with the highest risk value. First, the risk of damage to harvesting equipment with a risk value of 10 and a medium risk level, second, the risk of replacing harvesting equipment with a risk value of 10 and a medium risk level, and third, the risk of SOPs and policies that are not running according to the risk value of 9 and a medium risk level. These three risks are risks with priority handling. The proposed improvements focus on equipment and procedure control, change management, management, documentation, monitoring, and training.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Rahyang Niskala Wastu Kencana | ||||||||
Date Deposited: | 11 Sep 2025 07:31 | ||||||||
Last Modified: | 11 Sep 2025 07:31 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/42753 |
Actions (login required)
![]() |
View Item |