Analisis Aliran Aktivitas Gudang Produk Jadi di PT Sakura Sukses Cemerlang Dengan Pendekatan Lean Warehouse

Harendsa, Naia Putri (2025) Analisis Aliran Aktivitas Gudang Produk Jadi di PT Sakura Sukses Cemerlang Dengan Pendekatan Lean Warehouse. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (COVER)
21032010108.-cover.pdf

Download (2MB)
[img] Text (BAB 1)
21032010108.-bab 1.pdf

Download (301kB)
[img] Text (BAB 2)
21032010108.-bab 2.pdf
Restricted to Repository staff only until 31 May 2027.

Download (438kB)
[img] Text (BAB 3)
21032010108.-bab 3.pdf
Restricted to Repository staff only until 31 May 2027.

Download (283kB)
[img] Text (BAB 4)
21032010108.-bab 4.pdf
Restricted to Repository staff only until 31 May 2027.

Download (557kB)
[img] Text (BAB 5)
21032010108.-bab 5.pdf

Download (216kB)
[img] Text (DAFTAR PUSTAKA)
21032010108.-daftarpustaka.pdf

Download (162kB)
[img] Text (LAMPIRAN)
21032010108.-lampiran.pdf
Restricted to Repository staff only until 31 May 2027.

Download (386kB)

Abstract

PT Sakura Suksses Cemerlang is a light steel processing manufacturing company that specializes in the production of hollow structural sections. Warehouses are one of the critical elements that support the operational activities of an industry. Warehousing activities at PT SSC ain’t been optimal due to waste. Waste that occurs such as searching for empty areas for storage, waiting time for the next process, repeated product inspections, has an impact on the flow of warehousing activities. This study aims to determine the level of waste and provide suggestions for improvements to reduce waste in the flow of finished product warehousing activities at PT SSC. This study uses the Lean Warehousing method consisting of Value Stream Mapping, Process Activity Mapping, and 5 Whys Analysis. The results of this study identify 4 wasteful activities with the highest time. The proposed improvements can reduce 8 non-value-added activities and reduce activity time by 1015 minutes. The proposed improvements also increase Process Cycle Efficiency by 15.32% from 11.17% to 26.49%. This proves that the implementation of lean warehouse can improve efficiency and service quality.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPulansari, FaridaNIDN0702037901UNSPECIFIED
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: naia putri harendsa
Date Deposited: 03 Jul 2025 05:13
Last Modified: 03 Jul 2025 05:13
URI: https://repository.upnjatim.ac.id/id/eprint/36953

Actions (login required)

View Item View Item