ANALISIS BEBAN KERJA KARYAWAN DIVISI PRODUKSI PT. MITRA MAHARTA DENGAN METODE FULL TIME EQUIVALENT (FTE) DAN NASA-TLX

Agungdiningrat, Maulana Malik (2024) ANALISIS BEBAN KERJA KARYAWAN DIVISI PRODUKSI PT. MITRA MAHARTA DENGAN METODE FULL TIME EQUIVALENT (FTE) DAN NASA-TLX. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
18032010170-cover.pdf

Download (2MB)
[img] Text (Bab 1)
18032010170-bab1.pdf

Download (98kB)
[img] Text (Bab 2)
18032010170-bab2.pdf
Restricted to Repository staff only until 13 September 2027.

Download (352kB)
[img] Text (Bab 3)
18032010170-bab3.pdf
Restricted to Repository staff only until 13 September 2027.

Download (106kB)
[img] Text (Bab 4)
18032010170-bab4.pdf
Restricted to Repository staff only until 13 September 2027.

Download (572kB)
[img] Text (Bab 5)
18032010170-bab5.pdf

Download (89kB)
[img] Text (Daftar Pustaka)
18032010170-daftarpustaka.pdf

Download (119kB)
[img] Text (Lampiran)
18032010170-lampiran.pdf
Restricted to Repository staff only

Download (5MB)

Abstract

Combine Harvester is one of the products of PT Mitra Maharta that requires high work demands and accuracy in the production process. Workers in the production division tend to cause uneven workloads due to intensive labor demands and the obligation to work with high accuracy. This study purpose is to measure the workloads of workers in production department of PT. Mitra Maharta. This research use the NASA-TLX and FTE (Full Time Equivalent) methods to measure the workloads of 14 production workers. The results show some workers have an average WWL value from the range of 64 - 84.33 with the categories “High” to “Very High” in the NASA-TLX calculation, while in the FTE method calculation, they have an FTE index value from the range of 0.79 - 1.32 with the categories “Underload”, “Normal”, and “Overload”. The recommendation given based on the SWOT diagram in quadrant II is strategic diversification, which means that the company is advised to increase the variety of its tactical strategies. Keywords : Full Time Equivalent, NASA-TLX, Workload

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRusindiyanto, RusindiyantoNIDN0725026501rusindiyanto4@gmail.com
Thesis advisorPrameswari, Mega CattleyaNIDN0012119204mega.cattleya.ti@upnjatim.ac.id
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Maulana Malik Agungdiningrat
Date Deposited: 13 Sep 2024 03:45
Last Modified: 13 Sep 2024 03:46
URI: https://repository.upnjatim.ac.id/id/eprint/28955

Actions (login required)

View Item View Item