Agustin, Alika Kurnia (2023) Optimalisasi Kegiatan Setting Function pada Proyek Pembangunan Kapal Menggunakan Metode CPM dan PERT. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
Text (Cover)
20032010060-Cover.pdf Download (503kB) |
|
Text (Bab 1)
20032010060-Bab1.pdf Download (146kB) |
|
Text (Bab 2)
20032010060-Bab2.pdf Restricted to Repository staff only until 10 September 2027. Download (257kB) |
|
Text (Bab 3)
20032010060-Bab3.pdf Restricted to Repository staff only until 10 September 2027. Download (488kB) |
|
Text (Bab 4)
20032010060-Bab4.pdf Restricted to Repository staff only until 10 September 2027. Download (89kB) |
|
Text (Bab 5)
20032010060-Bab5.pdf Download (28kB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Alika Kurnia | ||||||||
Date Deposited: | 11 Sep 2024 05:05 | ||||||||
Last Modified: | 11 Sep 2024 05:05 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/28797 |
Actions (login required)
View Item |