IMPLEMENTASI HOUSE OF RISK (HOR) DAN ROOT CAUSE ANALYSIS DALAM STRATEGI MITIGASI RISIKO KEGAGALAN MESIN DAN ALAT PRODUKSI PADA PT INDUSTRI KERETA API

Persada, Ikhlas Damai (2024) IMPLEMENTASI HOUSE OF RISK (HOR) DAN ROOT CAUSE ANALYSIS DALAM STRATEGI MITIGASI RISIKO KEGAGALAN MESIN DAN ALAT PRODUKSI PADA PT INDUSTRI KERETA API. Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.

[img] Text (COVER)
20032010141-cover.pdf

Download (1MB)
[img] Text (BAB 1)
20032010141-bab1.pdf

Download (102kB)
[img] Text (BAB 2)
20032010141-bab2.pdf
Restricted to Repository staff only until 30 May 2028.

Download (315kB)
[img] Text (BAB 3)
20032010141-bab3.pdf
Restricted to Repository staff only until 30 May 2028.

Download (31kB)
[img] Text (BAB 4)
20032010141-bab4.pdf
Restricted to Repository staff only until 30 May 2028.

Download (399kB)
[img] Text (BAB 5)
20032010141-bab5.pdf

Download (13kB)
[img] Text (DAFTAR PUSTAKA)
20032010141-daftarpustaka.pdf

Download (80kB)
[img] Text (LAMPIRAN)
20032010141-lampiran.pdf
Restricted to Repository staff only until 30 May 2028.

Download (1MB)

Abstract

PT Industri Kereta Api or commonly called PT INKA is a company engaged in the field of railway production. One of the machines that often experiences damage is the Gap Shear / Hydraulic Shear machine, with a total of 41 repairs during the period June 2023 to February 2024. From this problem it is necessary to carry out an analysis using the House of Risk (HOR) method and Root Cause analysis to determine optimal risk mitigation strategies so as to minimize the occurrence of machine damage. The results of the research recommend that companies can monitor and analyze the service life of machine components based on the intensity of machine use, implement a production scheduling system and apply predictive analysis of safe production quantities for machine reliability, implement regular training programs for operators regarding instructions and standards for machine use and create a clear and easy to understand machine usage manual provide clear documentation regarding the materials used and their characteristics, and implement preventive maintenance based on vibration monitoring data. There was also a significant reduction in idle time, namely 207 hours, 40 minutes. This is in accordance with the Pareto diagram principle namely improving 20% will have an impact of 80%, in this case idle time is reduced by 78% by mitigating 22%.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSZS, Joumil AidilNIDNUNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Ikhlas Damai Persada
Date Deposited: 30 May 2024 08:32
Last Modified: 27 Jun 2024 01:56
URI: https://repository.upnjatim.ac.id/id/eprint/23573

Actions (login required)

View Item View Item