ANALISIS DAN MITIGASI RISIKO PADA SUPPY CHAIN DI PT INDUSTRI KERETA API MADIUN DENGAN PENDEKATAN HOUSE OF RISK (HOR

Liddin, Jundana Shidqiyah (2024) ANALISIS DAN MITIGASI RISIKO PADA SUPPY CHAIN DI PT INDUSTRI KERETA API MADIUN DENGAN PENDEKATAN HOUSE OF RISK (HOR. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (COVER)
18032010123,-cover.pdf

Download (873kB)
[img] Text (BAB 1)
18032010123.-bab1.pdf

Download (137kB)
[img] Text (BAB 2)
18032010123.-bab2.pdf
Restricted to Repository staff only until 30 May 2026.

Download (1MB)
[img] Text (BAB 3)
18032010123.-bab3.pdf
Restricted to Repository staff only until 30 May 2026.

Download (164kB)
[img] Text (BAB 4)
18032010123.-bab4.pdf
Restricted to Repository staff only until 30 May 2026.

Download (921kB)
[img] Text (BAB 5)
18032010123.-bab5.pdf

Download (95kB)
[img] Text (DAFTAR PUSTAKA)
18032010123.-daftarpustaka.pdf

Download (134kB)
[img] Text (LAMPIRAN)
18032010123.-lampiran.pdf
Restricted to Repository staff only

Download (234kB)

Abstract

In carrying out business processes in the LRT manufacturing sector, risks were discovered which resulted in disruption of the supply chain process in mitigating risks in the wiring harness supply chain. Risks are essentially events that have a negative impact on the Company's targets and strategies. Research data was collected by interviewing 3 respondents who were active employees of PT Industri Kereta Api Madiun. Data processing uses the House of Risk (HOR) phase 1 and House of Risk (HOR) phase 2 models, and also uses several treatments such as determining the risk agent carried out by the handler and based on the highest Aggregate Risk Potential (ARP) priority value from the Pareto diagram. The results of this study show that there are 25 risk events caused by 33 causes of risk in the company's supply chain activities. Based on the Pareto diagram analysis, 80.85% priority mitigation actions were taken, of which 13 risk agents were proposed to minimize the most dominant

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
UNSPECIFIEDPulansari, FaridaNIDN0703027901farida.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Jundana Shidqiyah Liddin
Date Deposited: 30 May 2024 08:09
Last Modified: 30 May 2024 08:09
URI: https://repository.upnjatim.ac.id/id/eprint/23439

Actions (login required)

View Item View Item