Rabbani, Adithya Daffa (2026) PABRIK HIDROGEN (H2) DARI BATUBARA DENGAN PROSES GASIFIKASI KAPASITAS 55.000 TON/TAHUN. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (Cover)
21031010137-COVER.pdf Download (3MB) | Preview |
|
|
Text (Bab 1)
21031010137-BAB 1.pdf Download (894kB) | Preview |
|
|
Text (Bab 2)
21031010137-BAB 2.pdf Restricted to Repository staff only until 21 May 2029. Download (717kB) |
||
|
Text (Bab 3)
21031010137-BAB 3.pdf Restricted to Repository staff only until 21 May 2029. Download (283kB) |
||
|
Text (Bab 4)
21031010137-BAB 4.pdf Restricted to Repository staff only until 21 May 2029. Download (591kB) |
||
|
Text (Bab 5)
21031010137-BAB 5.pdf Restricted to Repository staff only until 21 May 2029. Download (718kB) |
||
|
Text (Bab 6)
21031010137-BAB 6.pdf Restricted to Repository staff only until 21 May 2029. Download (252kB) |
||
|
Text (Bab 7)
21031010137-BAB 7.pdf Restricted to Repository staff only until 21 May 2029. Download (1MB) |
||
|
Text (Bab 8)
21031010137-BAB 8.pdf Restricted to Repository staff only until 21 May 2029. Download (364kB) |
||
|
Text (Bab 9)
21031010137-BAB 9.pdf Restricted to Repository staff only until 21 May 2029. Download (304kB) |
||
|
Text (Bab 10)
21031010137-BAB 10.pdf Restricted to Repository staff only until 21 May 2029. Download (1MB) |
||
|
Text (Bab 11)
21031010137-BAB 11.pdf Download (254kB) | Preview |
|
|
Text (Daftar Pustaka)
21031010137-DAFTAR PUSTAKA.pdf Download (181kB) | Preview |
|
|
Text (Flowsheet)
21031010137-FLOWSHEET.pdf Restricted to Repository staff only until 2029. Download (1MB) |
Abstract
This document outlines the preliminary design for a hydrogen production plant utilizing a wet coal gasification process with an entrained flow gasifier, designed to produce 55,000 tons/year. The facility is planned to be established in 2030 in Satimpo, Bontang City, East Kalimantan, occupying a 40,200 m² area. Operating continuously for 330 days a year and 24 hours a day, the plant will be run by a Limited Liability Company utilizing a Line and Staff organizational structure with 205 employees. The primary raw materials are coal and air; coal was selected due to its abundant domestic supply from companies like PT. Kaltim Prima Coal, PT. BUMI, and Adaro. The gasification process operates at a pressure of 20 atm and temperatures ranging from 995°C to 1370°C to form hydrogen-rich syngas. To support these operations, the plant requires utilities including 134,748.12 kg/hour of steam, 11,187.4 kWh of electricity, 529.695 m³/hour of water, and 83.789 L/day of fuel. Economically, the project is structured with a 2-year construction period and an 8% annual bank interest rate. It demonstrates strong feasibility with a Return on Investment (ROI) of 41.18% before tax and 30.88% after tax, a payback period of 3 years and 11 months, an Internal Rate of Return (IRR) of 24.77%, and a Break-Even Point (BEP) of 39.50%.
| Item Type: | Thesis (Undergraduate) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TP Chemical technology > TP155 Chemical engineering | ||||||||
| Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
| Depositing User: | Rabbani Adithya Daffa | ||||||||
| Date Deposited: | 21 May 2026 08:00 | ||||||||
| Last Modified: | 21 May 2026 08:18 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/52046 |
Actions (login required)
![]() |
View Item |
