Trisadi, Difha (2024) Pekerjaan Pondasi Bore Pile Pada Proyek Callender Hamilton Jembatan Cisadane b Tangerang. Project Report (Praktek Kerja Lapang dan Magang). -. (Unpublished)
|
Text (cover)
20035010106.-cover.pdf Download (1MB) |
|
|
Text (bab 1)
20035010106.-bab1.pdf Download (957kB) |
|
|
Text (bab 2)
20035010106.-bab2.pdf Restricted to Repository staff only until 21 February 2027. Download (2MB) |
|
|
Text (bab 3)
20035010106.-bab3.pdf Restricted to Repository staff only until 21 February 2027. Download (1MB) |
|
|
Text (bab 4)
20035010106.-bab4.pdf Restricted to Repository staff only until 21 February 2027. Download (5MB) |
|
|
Text (bab 5)
20035010106.-bab5.pdf Restricted to Repository staff only until 21 February 2027. Download (3MB) |
|
|
Text (bab 6)
20035010106.-bab6.pdf Download (288kB) |
|
|
Text (daftar pustaka)
20035010106.-daftarpustaka.pdf Download (335kB) |
|
|
Text (lampiran)
20035010106.-lampiran.pdf Restricted to Repository staff only until 21 February 2027. Download (42MB) |
Abstract
The background of the Cisadane B Bridge construction project in Tangerang is the condition of the old bridge, which is 51 years old and considered no longer proportional to the traffic load, as well as the inconsistency in the freeboard distance (clearance height) due to the overflow of the Cisadane River. This overhaul project aims to increase the freeboard and widen the bridge. This Field Work Report aims to provide a comprehensive overview of the project's organizational structure, the implementation method for the Bore Pile Casing Tanam (Permanent Casing Bore Pile) Foundation work, and the project management of the Callender Hamilton Bridge construction. The type of foundation used in this project is the bore pile. The foundation work implementation method includes an innovation by performing drilling work on top of the existing bridge through the dismantling of frames that obstructed the drilling point. The main work stages include shoring installation, bore pile coordinate point measurement, excavation, installation of casing and reinforcement, concrete pouring, casing stripping, and PDA and CSL testing. The conclusion of this report indicates that the project's organizational structure is divided into two main project managers, namely the West Java and Banten sections, which are further divided into four detailed sections (West Java, Banten, East Java, and Central Java). During implementation, two additional bore pile points were added to the pier to strengthen the foundation. The project management uses a fix unit price contract type with a duration of 17 months, starting from June 2022 to November 2023. Keywords: Bore Pile Casing Tanam, Callender Hamilton Bridge, Implementation Method, Project Management, Cisadane.
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
| Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
| Depositing User: | Difha Trisadi | ||||||||
| Date Deposited: | 04 Dec 2025 02:48 | ||||||||
| Last Modified: | 04 Dec 2025 02:48 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/47682 |
Actions (login required)
![]() |
View Item |