Agung, M Arip Pancar (2025) Pra Rancangan Pabrik Asam Nitrat Dari Amonia dan Udara Dengan Proses Ostwald Kapasitas 75.000 Ton/Tahun. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (COVER)
COVER TA.pdf Download (944kB) |
|
|
Text (BAB I)
BAB 1.pdf Download (351kB) |
|
|
Text (BAB II)
BAB 2.pdf Download (388kB) |
|
|
Text (BAB III)
BAB 3.pdf Restricted to Repository staff only until 3 November 2028. Download (279kB) |
|
|
Text (BAB IV)
BAB 4.pdf Restricted to Repository staff only until 3 November 2028. Download (291kB) |
|
|
Text (BAB V)
BAB 5.pdf Restricted to Repository staff only until 3 November 2028. Download (563kB) |
|
|
Text (BAB VI)
BAB 6.pdf Restricted to Repository staff only until 3 November 2028. Download (234kB) |
|
|
Text (BAB VII)
BAB 7.pdf Restricted to Repository staff only until 3 November 2028. Download (1MB) |
|
|
Text (BAB VIII-XI)
BAB 8-11.pdf Restricted to Repository staff only until 3 November 2028. Download (1MB) |
|
|
Text (Daftar Pustaka)
DAFPUS.pdf Download (229kB) |
|
|
Text (Lampiran)
APPENDIX.pdf Restricted to Repository staff only until 3 November 2028. Download (3MB) |
|
|
Text (Flowsheet)
FLOWSHEET PABRIK ASAM NITRAT DAN UTILITAS.pdf Download (408kB) |
| Item Type: | Thesis (Undergraduate) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TP Chemical technology T Technology > TP Chemical technology > TP155 Chemical engineering |
||||||||
| Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
| Depositing User: | Mochammad Arip Pancar Agung | ||||||||
| Date Deposited: | 04 Nov 2025 02:39 | ||||||||
| Last Modified: | 04 Nov 2025 02:39 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/45951 |
Actions (login required)
![]() |
View Item |
