METODE PELAKSANAAN PROYEK PEMBANGUNAN HOTEL ASTON INN LUMAJANG

nasrullah, bima hanggara and firmansyah, moch syahrul (2027) METODE PELAKSANAAN PROYEK PEMBANGUNAN HOTEL ASTON INN LUMAJANG. Project Report (Praktek Kerja Lapang dan Magang). Universitas Pembangunan Nasional " Veteran" Jawa Timur. (Unpublished)

[img]
Preview
Text (Cover)
COVER.pdf

Download (18MB) | Preview
[img]
Preview
Text (Bab 1)
BAB 1.pdf

Download (18MB) | Preview
[img]
Preview
Text (Bab 2)
BAB 2.pdf

Download (18MB) | Preview
[img] Text (Bab 3)
BAB 3.pdf
Restricted to Repository staff only until 16 September 2027.

Download (376kB)
[img] Text (Bab 4)
BAB 4.pdf
Restricted to Repository staff only until 16 September 2027.

Download (18MB)
[img] Text (Bab 5)
BAB 5.pdf
Restricted to Repository staff only until 16 September 2027.

Download (18MB)
[img] Text (Bab 6)
BAB 6.pdf
Restricted to Repository staff only until September 2027.

Download (18MB)
[img] Text (Bab 7)
BAB 7.pdf
Restricted to Repository staff only until 16 September 2027.

Download (18MB)
[img] Text (Bab 8)
BAB 8.pdf
Restricted to Repository staff only until 16 September 2027.

Download (18MB)
[img] Text (Bab 9)
BAB 9.pdf
Restricted to Repository staff only until 16 September 2027.

Download (18MB)
[img]
Preview
Text (Bab 10)
BAB 10.pdf

Download (18MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
DAFTAR PUSTAKA.pdf

Download (18MB) | Preview
[img] Text (Lampiran)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (18MB)

Abstract

-

Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorkartini, wahyuNIDN0720046303wahyu.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Bima Hanggara Nasrullah
Date Deposited: 26 May 2026 04:30
Last Modified: 26 May 2026 04:30
URI: https://repository.upnjatim.ac.id/id/eprint/43646

Actions (login required)

View Item View Item