Analisa Manajemen Risiko pada Proses Panen Kelapa Sawit dengan Menggunakan Metode Mix Method (Studi Kasus di PT XYZ Kalimantan Selatan)

Rahyang Niskala, Wastu Kencana (2025) Analisa Manajemen Risiko pada Proses Panen Kelapa Sawit dengan Menggunakan Metode Mix Method (Studi Kasus di PT XYZ Kalimantan Selatan). Undergraduate thesis, UPN "Veteran" Jawa Timur.

[img] Text (Cover)
Skripsi_Cover.pdf

Download (3MB)
[img] Text (Bab 1)
Skripsi_Bab 1.pdf

Download (124kB)
[img] Text (Bab 2)
Skripsi_Bab 2.pdf
Restricted to Repository staff only until 31 December 2030.

Download (290kB)
[img] Text (Bab 3)
Skripsi_Bab 3.pdf
Restricted to Repository staff only until 31 December 2030.

Download (149kB)
[img] Text (Bab 4)
Skripsi_Bab 4.pdf
Restricted to Repository staff only until 31 December 2030.

Download (395kB)
[img] Text (Bab 5)
Skripsi_Bab 5.pdf

Download (109kB)
[img] Text (Daftar Pustaka)
Skripsi_Daftar Pustaka.pdf

Download (128kB)
[img] Text (Lampiran)
Skripsi_Lampiran.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

The harvesting process in oil palm plantations is one of the critical stages that affect productivity. XYZ Company is a business group engaged in various sectors. XYZ Company has various subsidiaries operating under the XYZ brand. The company continues to strive to control and mitigate risks in every part of the company, especially in the harvesting process in oil palm plantations. The current problem is the risks that arise in the harvesting process in oil palm plantations, both from operational risks, environmental risks, and human resource risks that can impact the harvesting process. This study aims to identify the types of risks in the oil palm harvesting process at XYZ Company South Kalimantan, determine the dominant risk levels in the oil palm harvesting process and determine the appropriate improvement proposals using a mixed method, which combines qualitative and quantitative techniques. The results of the study indicate that there are three levels of risk with the highest risk value. First, the risk of damage to harvesting equipment with a risk value of 10 and a medium risk level, second, the risk of replacing harvesting equipment with a risk value of 10 and a medium risk level, and third, the risk of SOPs and policies that are not running according to the risk value of 9 and a medium risk level. These three risks are risks with priority handling. The proposed improvements focus on equipment and procedure control, change management, management, documentation, monitoring, and training.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorIriani, Iriani196211261988032001irianiupn@gmail.com
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Rahyang Niskala Wastu Kencana
Date Deposited: 11 Sep 2025 07:31
Last Modified: 11 Sep 2025 07:31
URI: https://repository.upnjatim.ac.id/id/eprint/42753

Actions (login required)

View Item View Item