Analisis Lean Warehousing untuk Mengurangi Waste dengan Metode Waste Assessment Model (WAM) di Gudang Alat Berat pada PT Sumber Nusantara Surabaya

Maulana, Alfin Bima (2025) Analisis Lean Warehousing untuk Mengurangi Waste dengan Metode Waste Assessment Model (WAM) di Gudang Alat Berat pada PT Sumber Nusantara Surabaya. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
21032010158 -cover.pdf

Download (953kB)
[img] Text (Bab 1)
21032010158 -BAB 1.pdf

Download (257kB)
[img] Text (Bab 2)
21032010158 -BAB 2.pdf
Restricted to Repository staff only until 13 February 2027.

Download (872kB) | Request a copy
[img] Text (Bab 3)
21032010158 -BAB 3.pdf
Restricted to Repository staff only until 13 February 2027.

Download (149kB) | Request a copy
[img] Text (Bab 4)
21032010158 -BAB 4.pdf
Restricted to Repository staff only until 13 February 2027.

Download (1MB) | Request a copy
[img] Text (Bab 5)
21032010158 -BAB 5.pdf

Download (80kB)
[img] Text (Dafpus)
21032010158 -Dafpus.pdf

Download (125kB)
[img] Text (Lampiran)
21032010158 -Lampiran.pdf
Restricted to Repository staff only until 13 February 2027.

Download (768kB) | Request a copy

Abstract

Warehouses play an important role in maintaining product quality until the product is delivered to consumers. The many important activities in the warehouse require companies to improve their performance to be effective and efficient in order to maintain trust. PT Sumber Nusantara is a private company engaged in civil construction, landfilling, cut and fill, heavy equipment rental, and spare part distributor. In warehousing activities, there are various activities that do not have added value or waste. Therefore, this study aims to identify waste and provide recommendations for improving warehousing activities. The implementation of Lean Warehousing is carried out by identifying the warehousing flow process with Value Stream Mapping (VSM), then identifying 7 wastes that occur in the warehousing process using the Waste Assessment Model (WAM) method. The results of the study showed that the waste with the highest percentage level was waste inventory (I) waste overpurchase (O) waste defect (D). From the proposed improvements and the current value stream mapping, it was found that the lead time was reduced to 544 minutes, which eliminated 200 minutes of non- value added activity. So that activity increased by 27% from the initial condition.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorErnawati, DiraNIDN0702067802dira.ernawati.ti@upnjatim.ac.id
Thesis advisorDewi, SintaNIDN0730088801sinta.dewi.ti@upnjatim.ac.id
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Alfin Bima Maulana
Date Deposited: 13 Feb 2025 01:37
Last Modified: 13 Feb 2025 01:37
URI: https://repository.upnjatim.ac.id/id/eprint/34691

Actions (login required)

View Item View Item