Optimalisasi Kegiatan Setting Function pada Proyek Pembangunan Kapal Menggunakan Metode CPM dan PERT

Agustin, Alika Kurnia (2023) Optimalisasi Kegiatan Setting Function pada Proyek Pembangunan Kapal Menggunakan Metode CPM dan PERT. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img] Text (Cover)
20032010060-Cover.pdf

Download (503kB)
[img] Text (Bab 1)
20032010060-Bab1.pdf

Download (146kB)
[img] Text (Bab 2)
20032010060-Bab2.pdf
Restricted to Repository staff only until 10 September 2027.

Download (257kB)
[img] Text (Bab 3)
20032010060-Bab3.pdf
Restricted to Repository staff only until 10 September 2027.

Download (488kB)
[img] Text (Bab 4)
20032010060-Bab4.pdf
Restricted to Repository staff only until 10 September 2027.

Download (89kB)
[img] Text (Bab 5)
20032010060-Bab5.pdf

Download (28kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSyaifullah, Hafid0017108907UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Alika Kurnia
Date Deposited: 11 Sep 2024 05:05
Last Modified: 11 Sep 2024 05:05
URI: https://repository.upnjatim.ac.id/id/eprint/28797

Actions (login required)

View Item View Item