SISTEM PRODUKSI DAN PENGGUNAAN METODE JAM HENTI UNTUK MENGHITUNG WAKTU BAKU STASIUN KERJA PRODUKSI SPUN PILE DI PT WASKITA BETON PRECAST, TBK PLANT PRAMBON

Sande, Nabila Aqiila SISTEM PRODUKSI DAN PENGGUNAAN METODE JAM HENTI UNTUK MENGHITUNG WAKTU BAKU STASIUN KERJA PRODUKSI SPUN PILE DI PT WASKITA BETON PRECAST, TBK PLANT PRAMBON. Project Report (Praktek Kerja Lapang). UPN VETERAN JAWA TIMUR. (Submitted)

[img]
Preview
Text (COVER)
COVER.pdf

Download (2MB) | Preview
[img]
Preview
Text (BAB 1)
BAB 1.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB 2)
BAB 2.pdf

Download (5MB) | Preview
[img]
Preview
Text (BAB 3)
BAB 3.pdf

Download (8MB) | Preview
[img] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only until 18 July 2024.

Download (4MB)
[img] Text (BAB 5)
BAB 5.pdf
Restricted to Registered users only until 18 July 2024.

Download (316kB)
[img]
Preview
Text (BAB 6)
BAB 6.pdf

Download (399kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (1MB) | Preview
[img] Text (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Registered users only until 18 July 2024.

Download (1MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorErnawati, DiraNIDN0702067802UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Nabila Aqiila Sande
Date Deposited: 19 Jul 2022 07:41
Last Modified: 19 Jul 2022 07:41
URI: http://repository.upnjatim.ac.id/id/eprint/7635

Actions (login required)

View Item View Item