Muhammad, Fawwas Averous (2022) Analisis Penerapan Metode Just In Time dalam Menunjang Proses Produksi Fabrikasi Struktur Baja ( Studi Kasus pada PT. Energi Indonesia Persada Project Package V Jayapura 2018). Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (Cover)
1542010079_cover.pdf.pdf Download (830kB) | Preview |
|
|
Text (Bab I)
1542010079_Bab1.pdf.pdf Download (712kB) | Preview |
|
Text (Bab II)
1542010079_Bab2.pdf.pdf Restricted to Registered users only until 8 July 2024. Download (852kB) |
||
Text (Bab III)
1542010079_Bab3.pdf.pdf Restricted to Registered users only until 8 July 2024. Download (904kB) |
||
Text (Bab IV)
1542010079_Bab4.pdf.pdf Restricted to Registered users only until 8 July 2024. Download (715kB) |
||
|
Text (Bab V)
1542010079_Bab5.pdf.pdf Download (465kB) | Preview |
|
|
Text (Daftar Pustaka)
1542010079_Daftar_pustaka.pdf.pdf Download (475kB) | Preview |
|
Text (Lampiran)
1542010079_lampiran.pdf.pdf Restricted to Registered users only until 8 July 2024. Download (482kB) |
Abstract
FAWWAS AVEROUS MUHAMMAD, 1542010079, Analysis of the Application of the Just In Time Method in Supporting the Steel Structure Fabrication Production Process (Case Study at PT. Energi Indonesia Persada Project Package V Jayapura 2018) The purpose of this research to determine how the application of just in time in the steel structure fabrication production process at PT. Energi Indonesia Persada Project Pakage V Jayapura 2018. The population of this research is,support data from the officers who are in the fabrication workshop of PT. Energy Indonesia Persada. The sample are project heads, project managers, and coordinators were used. Data collection techniques in this study there are two sources of data, quantitative data in the form of documentation and qualitative data in the form of interviews with data documentation criteria and interviews with officers on this project. The analysis technique uses the principles of just in time and Manufacturing cycle effectiveness. The results of this research indicate that the application of just in time in the steel structure fabrication production process of PT. The Energi Indonesia Persada Project Package V Jayapura 2018 is not in accordance with the principles of just-in-time where there are delays in raw materials from suppliers and the monthly MCE number is still fluctuating and shows an ineffective figure. Keywords: Just In Time Method, Production Process, Productivity
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | H Social Sciences > H Social Sciences (General) H Social Sciences > HB Economic Theory H Social Sciences > HC Economics |
||||||||
Divisions: | Faculty of Social and Political Sciences > Departement of Business Administration | ||||||||
Depositing User: | Fawwas Averous Muhammad | ||||||||
Date Deposited: | 08 Jul 2022 08:21 | ||||||||
Last Modified: | 08 Jul 2022 08:21 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/7360 |
Actions (login required)
View Item |