PERENCANAAN PELAT LANTAI PADA PEMBANGUNAN PONDOK PESANTREN SURYALAYA SURABAYA

PERMATA, APRILIA GITA (2022) PERENCANAAN PELAT LANTAI PADA PEMBANGUNAN PONDOK PESANTREN SURYALAYA SURABAYA. UPN Veteran Jawa Timur.

[img]
Preview
Text
1653010002_cover.pdf

Download (1MB) | Preview
[img]
Preview
Text
1653010002_bab1.pdf

Download (417kB) | Preview
[img]
Preview
Text
1653010002_bab2.pdf

Download (1MB) | Preview
[img] Text
1653010002_bab3.pdf
Restricted to Registered users only until 2024.

Download (1MB)
[img] Text
1653010002_bab4.pdf
Restricted to Registered users only until 2024.

Download (1MB)
[img]
Preview
Text
1653010002_bab5.pdf

Download (13kB) | Preview
[img]
Preview
Text
1653010002_daftarpustaka.pdf

Download (125kB) | Preview
[img] Text
1653010002_lampiran.pdf
Restricted to Registered users only until 2024.

Download (4MB)

Abstract

A work plan that has been established is used as a guide for the implementation of work at an implementation stage. Project management in working on a project is very important and is needed so that the work on a project can run smoothly according to the specified cost and time. Making an organizational structure in a project is very important in order to know the working relationship of several parties involved. The nature of the contract used in this project is a Unit Price Contract. Job evaluation is carried out once a week to detect possible errors as early as possible. The results of the evaluation and experience can be used as a reference for implementation in the field to get good results. The work of making floor plates in the Suryalaya Islamic Boarding School Surabaya project is divided into 4 jobs, namely formwork installation, ironing, casting and lastly maintenance. Elevation checks are carried out during formwork installation and casting work (to check the decrease in formwork elevation when the concrete has filled the formwork). Equipment to be used for work must be in good condition and can be used to prevent data errors in the field or accidents that can be caused by damaged equipment. The reinforcement used for the floor slab is D7 - 125 mm for the x (longitudinal) and y (transverse) directions.

Item Type: Other
Contributors:
ContributionContributorsNIDN/NIDKEmail
OtherSHOLICHIN, IBNUNIDN0718097102ibnu.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: APRILIA GITA PERMATA
Date Deposited: 21 Jan 2022 02:53
Last Modified: 21 Jan 2022 02:53
URI: http://repository.upnjatim.ac.id/id/eprint/4638

Actions (login required)

View Item View Item