Analisis Penjadwalan Produksi dengan Metode Campbell Dudek Smith untuk Meminimasi Makespan pada PT. Multi Manao Indonesia

Rohmah, Safiur (2023) Analisis Penjadwalan Produksi dengan Metode Campbell Dudek Smith untuk Meminimasi Makespan pada PT. Multi Manao Indonesia. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
19032010050-cover.pdf

Download (716kB) | Preview
[img]
Preview
Text (BAB I)
19032010050-bab1.pdf

Download (162kB) | Preview
[img] Text (BAB II)
19032010050-bab2.pdf
Restricted to Registered users only until 29 December 2025.

Download (432kB)
[img] Text (BAB III)
19032010050-bab3.pdf
Restricted to Registered users only until 29 December 2025.

Download (331kB)
[img] Text (BAB IV)
19032010050-bab4.pdf
Restricted to Registered users only until 29 December 2025.

Download (349kB)
[img]
Preview
Text (BAB V)
19032010050-bab5.pdf

Download (74kB) | Preview
[img]
Preview
Text (Daftar pustaka)
19032010050-daftarpustaka.pdf

Download (144kB) | Preview
[img] Text (LAMPIRAN)
19032010050-lampiran.pdf
Restricted to Registered users only until 29 December 2025.

Download (865kB)

Abstract

PT. XYZ is a wood-made furniture manufacturing company, one of which is a chair with a variety of types like arm chair, a bar drum, a drum counter and side chair. In the process, sometimes some orders are late. It's in the high-solution total time. Therefore, scheduling in the company requires a renewal of methods to identify which methods of scheduling efficiency in reducing production. Campbell dudek Smith's method is used because control processes are done according to the smallest working time used in production. Campbell dudek Smith's methods are appropriate and can be applied to help control the production with a flowshop system that is more than two machines. Results from research obtained a large schedule at company scheduling FCFS method of 9.613.425 seconds with job sequence 1-2-3-4. While the Campbell dudek Smith method obtained a period of 8.329.203 seconds with the job sequence 2-3-1-4. The Campbell dudek Smith method was chosen as a proposal because it had the smallest byline of corporate methods.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorS, Joumil Aidil Saifuddin ZNIDN0018036209joumilaidils19@gmail.com
Thesis advisorI, Mega Cattleya Prameswari ANIDN0012119204mega.cattleya.ti@upnjatim.ac.id
Subjects: T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Safiur Rohmah
Date Deposited: 29 Dec 2023 06:39
Last Modified: 29 Dec 2023 06:39
URI: http://repository.upnjatim.ac.id/id/eprint/19188

Actions (login required)

View Item View Item