Setiawan, Agung (2023) Sistem Produksi dan Analisis Peramalan Bahan Baku Produksi Pembuatan Pressure Vessel Pada PT. Boma Bisma Indra. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (Cover)
19032010027-cover.pdf Download (390kB) | Preview |
|
|
Text (Bab 1)
19032010027-bab 1.pdf Download (131kB) | Preview |
|
|
Text (Bab 2)
19032010027-bab 2.pdf Download (260kB) | Preview |
|
Text (Bab 3)
19032010027-bab 3.pdf Restricted to Registered users only until 13 September 2025. Download (729kB) | Request a copy |
||
Text (Bab 4)
19032010027-bab 4.pdf Restricted to Registered users only until 13 September 2025. Download (392kB) | Request a copy |
||
Text (Bab 5)
19032010027-bab 5.pdf Restricted to Registered users only until 13 September 2025. Download (124kB) | Request a copy |
||
|
Text (Bab 6)
19032010027-bab 6.pdf Download (58kB) | Preview |
|
|
Text (Daftar Pustaka)
19032010027-daftarpustaka.pdf Download (57kB) | Preview |
|
Text (Lampiran)
19032010027-lampiran.pdf Restricted to Registered users only until 13 September 2025. Download (1MB) | Request a copy |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TS Manufactures T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Agung Setiawan | ||||||||
Date Deposited: | 15 Sep 2023 03:15 | ||||||||
Last Modified: | 15 Sep 2023 03:15 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/17333 |
Actions (login required)
View Item |