SISTEM PRODUKSI FURNITURE DAN PENGENDALIAN PERSEDIAAN BAHAN BAKU KAYU MAHONI MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) PADA PT. ROMI VIOLETA

Ramadhan, Ardana (2023) SISTEM PRODUKSI FURNITURE DAN PENGENDALIAN PERSEDIAAN BAHAN BAKU KAYU MAHONI MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) PADA PT. ROMI VIOLETA. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img]
Preview
Text (COVER)
19032010165.-Cover.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB I)
19032010165.-BAB 1.pdf

Download (81kB) | Preview
[img]
Preview
Text (BAB 2)
19032010165.-BAB 2.pdf

Download (121kB) | Preview
[img] Text (BAB 3)
19032010165.-BAB 3.pdf
Restricted to Registered users only until 14 September 2025.

Download (492kB) | Request a copy
[img] Text (BAB 4)
19032010165.-BAB 4.pdf
Restricted to Registered users only until 14 September 2025.

Download (760kB) | Request a copy
[img] Text (BAB 5)
19032010165.-BAB 5.pdf
Restricted to Registered users only until 14 September 2025.

Download (36kB) | Request a copy
[img]
Preview
Text (BAB 6)
19032010165.-BAB 6.pdf

Download (12kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
19032010165.-DAFTAR PUSTAKA.pdf

Download (74kB) | Preview
[img]
Preview
Text (LAMPIRAN)
19032010165.-LAMPIRAN.pdf

Download (416kB) | Preview
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSumiati, SumiatiNIDN0713126001UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Ardana Ramadhan
Date Deposited: 15 Sep 2023 08:05
Last Modified: 15 Sep 2023 08:05
URI: http://repository.upnjatim.ac.id/id/eprint/17303

Actions (login required)

View Item View Item