Putri, Juwita Dwi Rofia and Riza, Karima Nabila (2023) Praktik Kerja Lapang di Unit NPK Phonska I Departemen II A PT. Petrokimia Gresik. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur, UPN Veteran Jawa Timur. (Unpublished)
|
Text (COVER)
19031010175_COVER.pdf Download (1MB) | Preview |
|
|
Text (BAB 1)
19031010175_BAB 1.pdf Download (598kB) | Preview |
|
|
Text (BAB 2)
19031010175_BAB 2.pdf Download (168kB) | Preview |
|
Text (BAB 3)
19031010175_BAB 3.pdf Restricted to Registered users only until 24 July 2025. Download (437kB) |
||
Text (BAB 4)
19031010175_BAB 4.pdf Restricted to Registered users only until 24 July 2025. Download (139kB) |
||
Text (BAB 5)
19031010175_BAB 5.pdf Restricted to Registered users only until 24 July 2025. Download (110kB) |
||
Text (BAB 6-9)
19031010175_BAB 6-9.pdf Restricted to Registered users only until 24 July 2025. Download (592kB) |
||
|
Text (BAB 10)
19031010175_BAB 10.pdf Download (102kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
19031010175_DAFTAR PUSTAKA.pdf Download (162kB) | Preview |
Abstract
Production Department IIA PT. Petrokimia Gresik consists of NPK Phonska I, II, III and PF 1 plants. In calculating the mass balance with raw materials liquor, H3PO4, H2SO4, NH3 of 393508.8989 kg/hour will produce slurry and gas of 393508.8989 kg/hour. Heat balance required at the moment Incoming material is 76098863.37 kcal/hour and produces a balance the heat that comes out is 76098863.37 kcal/hour.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TP Chemical technology > TP155 Chemical engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
Depositing User: | JP Upn | ||||||||
Date Deposited: | 25 Jul 2023 06:28 | ||||||||
Last Modified: | 25 Jul 2023 06:28 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/16276 |
Actions (login required)
View Item |