Metode Pelaksanaan Konstruksi Kolom PB 2A Pada Proyek Jalan Lingkar Luar Barat (JLLB) Tahap 2

Christanto, Mas Ngabei David Johan Bagus Cahyo Christanto (2023) Metode Pelaksanaan Konstruksi Kolom PB 2A Pada Proyek Jalan Lingkar Luar Barat (JLLB) Tahap 2. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img]
Preview
Text (Cover)
17035010061.-cover.pdf.pdf

Download (744kB) | Preview
[img]
Preview
Text (BAB 1)
17035010061.-bab1.pdf.pdf

Download (74kB) | Preview
[img] Text (BAB 2)
17035010061.-bab2.pdf.pdf
Restricted to Registered users only until 10 May 2025.

Download (876kB)
[img] Text (BAB 3)
17035010061.-bab3.pdf.pdf
Restricted to Registered users only until 10 May 2025.

Download (1MB)
[img] Text (BAB 4)
17035010061.-bab4.pdf.pdf
Restricted to Registered users only until 10 May 2025.

Download (628kB)
[img]
Preview
Text (BAB 5)
17035010061.-bab5.pdf.pdf

Download (14kB) | Preview
[img]
Preview
Text (Daftar pustaka)
17035010061.-daftarpustaka.pdf.pdf

Download (129kB) | Preview
[img] Text (LAMPIRAN)
17035010061.-lampiran.pdf.pdf
Restricted to Registered users only until 10 May 2025.

Download (832kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPutra, I Nyoman Dita Pahang370030001751putra_indp.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Depositing User: David johan christanto
Date Deposited: 12 May 2023 02:57
Last Modified: 12 May 2023 02:57
URI: http://repository.upnjatim.ac.id/id/eprint/13216

Actions (login required)

View Item View Item