Browse by Contributors

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | Date | No Grouping
Jump to: A | J | R
Number of items: 3.

A

Agungdiningrat, Maulana Malik (2024) ANALISIS BEBAN KERJA KARYAWAN DIVISI PRODUKSI PT. MITRA MAHARTA DENGAN METODE FULL TIME EQUIVALENT (FTE) DAN NASA-TLX. Undergraduate thesis, UPN Veteran Jawa Timur.

J

JUWITA, ABELIA DHUWI ANALISIS PENERAPAN LEAN MANUFACTURING DAN 5S DI PT ATLANTIC ANUGRAH METALINDO MENGGUNAKAN METODE VSM. Project Report (Praktek Kerja Lapang dan Magang). JURNAL ONLINE STTKD.

R

Rahmadianto, Raihan (2025) Continous Improvement Lean Manufacturing Di PT Stechoq Robotika Indonesia. Project Report (Praktek Kerja Lapang dan Magang). -. (Unpublished)

This list was generated on Tue May 12 01:17:30 2026 WIB.