
Browse by Contributors
![]() | Up a level |
Number of items: 2.
2024
Agungdiningrat, Maulana Malik (2024) ANALISIS BEBAN KERJA KARYAWAN DIVISI PRODUKSI PT. MITRA MAHARTA DENGAN METODE FULL TIME EQUIVALENT (FTE) DAN NASA-TLX. Undergraduate thesis, UPN Veteran Jawa Timur.
2025
Rahmadianto, Raihan (2025) Continous Improvement Lean Manufacturing Di PT Stechoq Robotika Indonesia. Project Report (Praktek Kerja Lapang dan Magang). -. (Unpublished)