Hasbi, Muhammad Keyvan Khayree Putra (2026) FORECASTING KEBUTUHAN BATU GERINDA DAN KAWAT LAS PADA KONSTRUKSI KAPAL LPD 163M DENGAN METODE MA DAN DES. Project Report (Praktek Kerja Lapang dan Magang). Universitas Pembangunan Nasional "Veteran" Jawa Timur.
|
Text (Cover)
22032010109-cover.pdf Download (379kB) |
|
|
Text (Bab 1)
22032010109-bab1.pdf Download (277kB) |
|
|
Text (Bab 2)
22032010109-bab2.pdf Restricted to Repository staff only until 21 July 2029. Download (353kB) |
|
|
Text (Bab 3)
22032010109-bab3.pdf Restricted to Repository staff only until 21 July 2029. Download (245kB) |
|
|
Text (Bab 4)
22032010109-bab4.pdf Restricted to Repository staff only until 21 July 2029. Download (410kB) |
|
|
Text (Bab 5)
22032010109-bab5.pdf Download (253kB) |
|
|
Text (Daftar Pustaka)
22032010109-daftarpustaka.pdf Download (220kB) |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management T Technology > TS Manufactures > TS 180-TS180.8 Material Handling V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Muhammad Keyvan Khayree Putra Hasbi | ||||||||
| Date Deposited: | 22 Jul 2026 04:19 | ||||||||
| Last Modified: | 22 Jul 2026 06:17 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/57302 |
Actions (login required)
![]() |
View Item |
