Project Management Information System for Genset Installation with Delay Detection Using the Fuzzy Tsukamoto Algorithm (Case Study: PT. Bolo Dewo Utomo)

Puspitasari, Indriani Ayu (2026) Project Management Information System for Genset Installation with Delay Detection Using the Fuzzy Tsukamoto Algorithm (Case Study: PT. Bolo Dewo Utomo). Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
22081010108-cover.pdf

Download (518kB)
[img] Text (Bab 1)
22081010108-bab1.pdf

Download (98kB)
[img] Text (Bab 2)
22081010108-bab2.pdf
Restricted to Repository staff only until 17 July 2029.

Download (403kB)
[img] Text (Bab 3)
22081010108-bab3.pdf
Restricted to Repository staff only until 17 July 2029.

Download (843kB)
[img] Text (Bab 4)
22081010108-bab4.pdf
Restricted to Repository staff only until 17 July 2029.

Download (834kB)
[img] Text (Bab 5)
22081010108-bab5.pdf

Download (74kB)
[img] Text (Daftar Pustaka)
22081010108-daftarpustaka.pdf

Download (101kB)
[img] Text (Lampiran)
22081010108-lampiran.pdf
Restricted to Repository staff only

Download (496kB)

Abstract

The construction industry still encounters project delays due to fragmented information management and unstructured progress reporting, including at PT Bolo Dewo Utomo as a generator-set installation contractor. This study develops a web-based Project Management Information System that integrates project data, progress reports, documents, and payment records, and incorporates a delay risk detection module using the Fuzzy Tsukamoto method. The system is built using the Waterfall model through analysis, design, implementation with Laravel and MySQL, and testing stages. The Fuzzy Tsukamoto module uses the percentage of realized payment and elapsed contract time as inputs to produce a delay risk index. Evaluation consists of Black Box Testing, the System Usability Scale (SUS), and an accuracy test against expert judgements on 25 project cases. The results show that all functions operate correctly, the average SUS score is 87.5 (excellent usability), and the algorithm achieves 88% accuracy, indicating that the system is suitable as a tool for project management and early warning of delay risk at PT Bolo Dewo Utomo.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorMumpuni, Retno198707162025212045retnomumpuni.if@upnjatim.ac.id
Thesis advisorNurlaili, Afina Lina199312132022032010afina.lina.if@upnjatim.ac.id
Subjects: Q Science > QA Mathematics > QA76.6 Computer Programming
Divisions: Faculty of Computer Science > Departemen of Informatics
Depositing User: Indriani Ayu Puspitasari
Date Deposited: 17 Jul 2026 08:00
Last Modified: 17 Jul 2026 08:00
URI: https://repository.upnjatim.ac.id/id/eprint/55892