Fadhillah, Naila Anargya (2026) PERAN SUPPLIER RELATIONSIP MANAGEMENT (SRM) DALAM PENGENDALIAN KUALITAS KOMPONEN PEMASOK DI PT. PANGGUNG ELECTRIC CITRABUANA. Project Report (Praktek Kerja Lapang dan Magang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (Cover)
22032010190.-cover.pdf Download (572kB) | Preview |
|
|
Text (Bab 1)
22032010190.-bab1.pdf Download (207kB) | Preview |
|
|
Text (Bab 2)
22032010190.-bab2.pdf Restricted to Repository staff only until 26 May 2029. Download (804kB) |
||
|
Text (Bab 3)
22032010190.-bab3.pdf Restricted to Repository staff only until 26 May 2029. Download (373kB) |
||
|
Text (Bab 4)
22032010190.-bab4.pdf Restricted to Repository staff only until 26 May 2029. Download (199kB) |
||
|
Text (Bab 5)
22032010190.-bab5.pdf Restricted to Repository staff only until 26 May 2029. Download (162kB) |
||
|
Text (Lampiran)
22032010190.-lampiran.pdf Restricted to Repository staff only until 26 May 2029. Download (196kB) |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > T Technology (General) T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Naila Anargya Fadhillah | ||||||||
| Date Deposited: | 02 Jun 2026 00:30 | ||||||||
| Last Modified: | 02 Jun 2026 00:31 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/52683 |
Actions (login required)
![]() |
View Item |
