Shalahuddin, Muhammad Miqdad Wildan and Tatya, Putra Darma LAPORAN MAGANG MBKM PROYEK PEMBANGUNAN JALAN TOL SOLO – YOGYAKARTA – NYIA KULON PROGO PAKET 1.2. Project Report (Praktek Kerja Lapang dan Magang). UPN 'Veteran" Jawa Timur Press. (Unpublished)
|
Text (COVER)
21035010130.-COVER.pdf Download (883kB) |
|
|
Text (BAB 1)
21035010130.-BAB 1.pdf Download (193kB) |
|
|
Text (BAB 2)
21035010130.-BAB 2.pdf Restricted to Repository staff only until 23 February 2029. Download (242kB) |
|
|
Text (BAB 3)
21035010130.-BAB 3.pdf Restricted to Repository staff only until 23 February 2029. Download (96kB) |
|
|
Text (BAB 4)
21035010130.-BAB 4.pdf Restricted to Repository staff only until 23 February 2029. Download (1MB) |
|
|
Text (BAB 5)
21035010130.-BAB 5.pdf Restricted to Repository staff only until 23 February 2029. Download (815kB) |
|
|
Text (BAB 6)
21035010130.-BAB 6.pdf Restricted to Repository staff only until 23 February 2029. Download (1MB) |
|
|
Text (BAB 7)
21035010130.-BAB 7.pdf Restricted to Repository staff only until 23 February 2029. Download (553kB) |
|
|
Text (BAB 8)
21035010130.-BAB 8.pdf Restricted to Repository staff only until 23 February 2029. Download (296kB) |
|
|
Text (BAB 9)
21035010130.-BAB 9.pdf Restricted to Repository staff only until 23 February 2029. Download (383kB) |
|
|
Text (BAB 10)
21035010130.-BAB 10.pdf Download (80kB) |
|
|
Text (DAFTAR PUSTAKA)
21035010130.-DAFTAR PUSTAKA.pdf Download (67kB) |
|
|
Text (LAMPIRAN)
21035010130.-LAMPIRAN.pdf Restricted to Repository staff only until 23 February 2029. Download (4MB) |
Abstract
The MBKM internship at the Solo–Yogyakarta–NYIA Kulon Progo Toll Road Construction Project Section 1 Package 1.2 aims to provide practical experience for students in understanding toll road construction processes. The project, executed by PT. Adhi Karya (Persero) Tbk, plays a strategic role in improving regional connectivity and transportation efficiency. The report was prepared through field observations, project data collection, literature review, and interviews with relevant parties. The discussion covers project administration, legal and labor aspects, traffic engineering at the Prambanan Toll Exit, environmental management, bore pile construction methods, heavy equipment management, long-span bridge structures, and the common borrow embankment method. The results indicate that the project implementation complies with construction management standards, quality control procedures, and occupational health and safety practices. Overall, the internship enhanced students’ understanding of the practical application of civil engineering theories and strengthened their professional readiness in the construction industry.
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TE Highway engineering. Roads and pavements T Technology > TG Bridge engineering |
||||||||
| Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
| Depositing User: | Muhammad Miqdad Wildan Shalahuddin | ||||||||
| Date Deposited: | 25 Feb 2026 03:03 | ||||||||
| Last Modified: | 25 Feb 2026 03:03 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/49662 |
Actions (login required)
![]() |
View Item |
