ANALISIS PENJADWALAN DENGAN MENGGUNAKAN KURVA S PADA PROYEK PEMBUATAN REACTOR TANK 30M3

Abdillah, Giyo Sekhan ANALISIS PENJADWALAN DENGAN MENGGUNAKAN KURVA S PADA PROYEK PEMBUATAN REACTOR TANK 30M3. Project Report (Praktek Kerja Lapang dan Magang). Jurnal Hasi Penelitian Dan Pengkajian Ilmiah Eksakta (JPPIE).

[img] Text (COVER)
21032010188-Cover.pdf

Download (689kB)
[img] Text (BAB 1)
21032010188-bab1.pdf

Download (129kB)
[img] Text (BAB 2)
21032010188-bab2.pdf

Download (92kB)
[img] Text (BAB 3)
21032010188-bab3.pdf
Restricted to Repository staff only until 25 January 2029.

Download (309kB)
[img] Text (BAB 4)
21032010188-bab4.pdf
Restricted to Repository staff only until 25 January 2029.

Download (12kB)
[img] Text (BAB 5)
21032010188-bab5.pdf
Restricted to Repository staff only until 25 January 2029.

Download (69kB)
[img] Text (DAFTAR PUSTAKA)
21032010188-DaftarPustaka.pdf

Download (71kB)
[img] Text (Lampiran)
21032010188-Lampiran.pdf
Restricted to Repository staff only

Download (534kB)

Abstract

Construction project activities can be defined as an activity that takes place within a limited period of time that has been determined with the allocation of certain resources and is intended to produce products whose quality criteria have been clearly outlined. In completing a construction job, scheduling is one of the things that is very important and needs to be paid attention to. PT. PDK received various projects, one of which was making a 30m^3 reactor tank. This tank work was carried out at the PT workshop. Putra Dharma Kencana. The S curve is a curve that describes the relationship between the accumulated value of development project implementation and project implementation. The weight on the S curve is the percentage of price for each job divided by the total price. If the total weight value is less than 100% then there is an error in the calculation which will affect the S curve. Work on the reactor tank was carried out according to the target, namely for 12 weeks. The disadvantage of the S curve method is the weight calculation. The weight used is the percentage of the price for each job with the total price

Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
UNSPECIFIEDWaluyo, MintoNIDN0730116101mintow.ti@upnjatim.ac.id
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Giyo Sekhan Abdillah giyo
Date Deposited: 26 Jan 2026 07:26
Last Modified: 26 Jan 2026 07:26
URI: https://repository.upnjatim.ac.id/id/eprint/49134

Actions (login required)

View Item View Item