Abdillah, Giyo Sekhan ANALISIS PENJADWALAN DENGAN MENGGUNAKAN KURVA S PADA PROYEK PEMBUATAN REACTOR TANK 30M3. Project Report (Praktek Kerja Lapang dan Magang). Jurnal Hasi Penelitian Dan Pengkajian Ilmiah Eksakta (JPPIE).
|
Text (COVER)
21032010188-Cover.pdf Download (689kB) |
|
|
Text (BAB 1)
21032010188-bab1.pdf Download (129kB) |
|
|
Text (BAB 2)
21032010188-bab2.pdf Download (92kB) |
|
|
Text (BAB 3)
21032010188-bab3.pdf Restricted to Repository staff only until 25 January 2029. Download (309kB) |
|
|
Text (BAB 4)
21032010188-bab4.pdf Restricted to Repository staff only until 25 January 2029. Download (12kB) |
|
|
Text (BAB 5)
21032010188-bab5.pdf Restricted to Repository staff only until 25 January 2029. Download (69kB) |
|
|
Text (DAFTAR PUSTAKA)
21032010188-DaftarPustaka.pdf Download (71kB) |
|
|
Text (Lampiran)
21032010188-Lampiran.pdf Restricted to Repository staff only Download (534kB) |
Abstract
Construction project activities can be defined as an activity that takes place within a limited period of time that has been determined with the allocation of certain resources and is intended to produce products whose quality criteria have been clearly outlined. In completing a construction job, scheduling is one of the things that is very important and needs to be paid attention to. PT. PDK received various projects, one of which was making a 30m^3 reactor tank. This tank work was carried out at the PT workshop. Putra Dharma Kencana. The S curve is a curve that describes the relationship between the accumulated value of development project implementation and project implementation. The weight on the S curve is the percentage of price for each job divided by the total price. If the total weight value is less than 100% then there is an error in the calculation which will affect the S curve. Work on the reactor tank was carried out according to the target, namely for 12 weeks. The disadvantage of the S curve method is the weight calculation. The weight used is the percentage of the price for each job with the total price
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management | ||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Giyo Sekhan Abdillah giyo | ||||||||
| Date Deposited: | 26 Jan 2026 07:26 | ||||||||
| Last Modified: | 26 Jan 2026 07:26 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/49134 |
Actions (login required)
![]() |
View Item |
