Alaik, Achmad Rodhiyan and Fahmi, Muhammad Naufal (2025) METODE PELAKSAAN KONTRUKSI PADA PROYEK JALAN TOL PASURUAN – PROBOLINGGO SEKSI 4 STA 31+500 – STA 04+050 KAB. PROBOLINGGO, JAWA TIMUR. Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.
|
Text (Cover)
19035010088-cover.pdf Download (508kB) |
|
|
Text (Bab 1)
19035010088-bab 1.pdf Download (185kB) |
|
|
Text (Bab 2)
19035010088-bab 2.pdf Restricted to Repository staff only until 4 December 2028. Download (545kB) |
|
|
Text (Bab 3)
19035010088-bab 3.pdf Restricted to Repository staff only until 4 December 2028. Download (158kB) |
|
|
Text (Bab 4)
19035010088-bab 4.pdf Restricted to Repository staff only until 4 December 2028. Download (1MB) |
|
|
Text (Bab 5)
19035010088-bab 5.pdf Restricted to Repository staff only until 4 December 2028. Download (928kB) |
|
|
Text (Bab 6)
19035010088-bab 6.pdf Download (71kB) |
|
|
Text (Daftar Pustaka)
19035010088-daftar pustaka.pdf Download (7kB) |
|
|
Text (Lampiran)
19035010088-lampiran.pdf Restricted to Repository staff only until 4 December 2028. Download (987kB) |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
| Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
| Depositing User: | Achmd Rodhiyan Alaik | ||||||||
| Date Deposited: | 23 Dec 2025 03:04 | ||||||||
| Last Modified: | 23 Dec 2025 03:37 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/47987 |
Actions (login required)
![]() |
View Item |
