Hidayatulloh, Faishal (2025) EVALUASI PENJADWALAN WAKTU DAN BIAYA MENGGUNAKAN METODE CPM DAN GANTT CHART PADA PROYEK PEMBUATAN CYCLONE DI PT PUTRA DHARMA KENCANA. Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.
|
Text (Cover)
21032010232-Cover.pdf Download (202kB) |
|
|
Text (Bab 1)
21032010232-bab1.pdf Download (2MB) |
|
|
Text (Bab 2)
21032010232-bab2.pdf Restricted to Repository staff only until 4 December 2028. Download (2MB) | Request a copy |
|
|
Text (Bab 3)
21032010232-bab3.pdf Restricted to Repository staff only until 4 December 2028. Download (2MB) | Request a copy |
|
|
Text (Bab 4)
21032010232-bab4.pdf Restricted to Repository staff only until 4 December 2028. Download (2MB) | Request a copy |
|
|
Text (Bab 5)
21032010232-bab5.pdf Download (2MB) |
|
|
Text (Daftar Pustaka)
21032010232-dafpus.pdf Download (2MB) |
|
|
Text (Lampiran)
21032010232-lampiran.pdf Restricted to Repository staff only until 4 December 2028. Download (2MB) | Request a copy |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic Planning H Social Sciences > HD Industries. Land use. Labor > HD62.15 Total Quality Management |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Faishal Hidayatulloh | ||||||||
| Date Deposited: | 22 Dec 2025 08:23 | ||||||||
| Last Modified: | 23 Dec 2025 02:12 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/47958 |
Actions (login required)
![]() |
View Item |
