Idris, Mukandar (2025) ANALISA PENJADWALAN WAKTU PROYEK MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM). Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.
|
Text (Cover)
21032010209-cover.pdf.pdf Download (507kB) |
|
|
Text (Bab 1)
21032010209-bab1.pdf.pdf Download (126kB) |
|
|
Text (Bab 2)
21032010209-bab2.pdf.pdf Restricted to Repository staff only until 3 December 2027. Download (140kB) | Request a copy |
|
|
Text (Bab 3)
21032010209-bab3.pdf.pdf Restricted to Repository staff only until 3 December 2027. Download (305kB) | Request a copy |
|
|
Text (Bab 4)
21032010209-bab4.pdf.pdf Download (16kB) |
|
|
Text (Bab 5)
21032010209-bab5.pdf.pdf Download (11kB) |
|
|
Text (Daftar Pustaka)
21032010209-daftarpustaka.pdf.pdf Download (103kB) |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic Planning H Social Sciences > HD Industries. Land use. Labor > HD62.15 Total Quality Management |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Mukandar Idris | ||||||||
| Date Deposited: | 22 Dec 2025 08:49 | ||||||||
| Last Modified: | 23 Dec 2025 02:24 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/47721 |
Actions (login required)
![]() |
View Item |