PRA RANCANGAN PABRIK NATRIUM TRIPOLIFOSFAT DARI ASAM FOSFAT DAN NATRIUM KARBONAT DENGAN PROSES DUA TAHAP

TAZKIYAH, LAILY (2025) PRA RANCANGAN PABRIK NATRIUM TRIPOLIFOSFAT DARI ASAM FOSFAT DAN NATRIUM KARBONAT DENGAN PROSES DUA TAHAP. Undergraduate thesis, UNIVERSITAS PEMBANGUNAN NASIONAL "VETERAN" JAWA TIMUR.

[img] Text (COVER)
COVER FIX.pdf

Download (5MB)
[img] Text (BAB I)
BAB I.pdf

Download (418kB)
[img] Text (BAB II)
BAB II.pdf

Download (241kB)
[img] Text (BAB III)
BAB III.pdf
Restricted to Repository staff only until 2 December 2028.

Download (379kB)
[img] Text (BAB IV)
BAB IV .pdf
Restricted to Repository staff only until 2 December 2028.

Download (209kB)
[img] Text (BAB V)
BAB V.pdf
Restricted to Repository staff only until 2 December 2028.

Download (989kB)
[img] Text (BAB VI)
BAB VI.pdf
Restricted to Repository staff only until 2 December 2028.

Download (264kB)
[img] Text (BAB VII)
BAB VII.pdf
Restricted to Repository staff only until 2 December 2028.

Download (1MB)
[img] Text (BAB VIII)
BAB VIII.pdf
Restricted to Repository staff only until 2 December 2028.

Download (417kB)
[img] Text (BAB IX)
BAB IX.pdf
Restricted to Repository staff only until 2 December 2028.

Download (340kB)
[img] Text (BAB X)
BAB X.pdf
Restricted to Repository staff only until 2 December 2028.

Download (324kB)
[img] Text (BAB XI)
BAB XI.pdf

Download (192kB)
[img] Text (DAFTAR PUSTAKA)
DAFPUS.pdf

Download (164kB)
[img] Text (LAMPIRAN)
LAMPIRAN (2).pdf
Restricted to Repository staff only until 2 December 2028.

Download (5MB)
[img] Text (FLOWSHEET)
FLOWSHEET.pdf

Download (999kB)

Abstract

A Sodium Tripolyphosphate (STPP) plant using a two-stage process with phosphoric acid and sodium carbonate as raw materials will be established in the Java Integrated Industrial and Port Estate (JIIPE), Gresik. The production steps include dissolving sodium carbonate to 55.5%, neutralizing it with phosphoric acid at 95% conversion to form phosphate salts, spray-drying the intermediates, converting them to STPP in a rotary kiln, and homogenizing the product with a ball mill before storage and packaging. The plant will operate continuously for 330 days per year under a limited liability company structure and a line-and-staff organization. It requires 6,040.7061 kg/h of phosphoric acid and 4,627.9727 kg/h of sodium carbonate to produce 6,313.1313 kg/h of STPP and 1,825.1652 kg/h of liquid CO₂, supported by utilities including steam, electricity, water, and fuel. Economically, with a total investment of Rp888.83 billion, the project shows strong feasibility, demonstrated by a 26.94% ROI, 23.83% IRR, a three-year payback period, and a break-even point of 33.38%.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSANI, SANINIDN0712046303UNSPECIFIED
Thesis advisorSUPRIANTI, LILIKNIDN0011048405UNSPECIFIED
Subjects: T Technology > TP Chemical technology
T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: laily tazkiyah tasya
Date Deposited: 03 Dec 2025 07:35
Last Modified: 03 Dec 2025 07:35
URI: https://repository.upnjatim.ac.id/id/eprint/47060

Actions (login required)

View Item View Item