Optimalisasi Produksi dan Desain Mesin di PT. Hume Sakti Indonesia

Ardhany, Muhammad Nizar Optimalisasi Produksi dan Desain Mesin di PT. Hume Sakti Indonesia. Project Report (Praktek Kerja Lapang dan Magang). UPN Veteran Jawa Timur. (Unpublished)

[img] Text (COVER)
COVER_merged.pdf

Download (2MB)
[img] Text (BAB I)
BAB I.pdf

Download (604kB)
[img] Text (BAB II)
BAB II.pdf

Download (677kB)
[img] Text (BAB III)
BAB III.pdf
Restricted to Repository staff only until 4 November 2028.

Download (570kB)
[img] Text (BAB IV)
BAB IV.pdf
Restricted to Repository staff only until 4 November 2028.

Download (173kB)
[img] Text (BAB V)
Bab V.pdf
Restricted to Repository staff only until 4 November 2028.

Download (516kB)
[img] Text (Daftar Pustaka)
019_Muhammad Nizar Ardhany_LAPORAN PELAKSANAAN-18.pdf

Download (102kB)
[img] Text
Lampiran.pdf
Restricted to Repository staff only until 4 November 2028.

Download (2MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Subjects: T Technology > T Technology (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Departement of Mechanical Engineering
Depositing User: Muhammad Nizar Ardhany
Date Deposited: 04 Nov 2025 08:57
Last Modified: 04 Nov 2025 08:57
URI: https://repository.upnjatim.ac.id/id/eprint/46116

Actions (login required)

View Item View Item