Pra Rancangan Pabrik 1,3 Butadiena dari Ethyl Alcohol dengan Proses Dehidrogenasi

Aini, Syaiba Qurrotul (2025) Pra Rancangan Pabrik 1,3 Butadiena dari Ethyl Alcohol dengan Proses Dehidrogenasi. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
cover ta_merged.pdf

Download (4MB)
[img] Text (BAB I)
BAB I TA FIX.pdf

Download (332kB)
[img] Text (BAB II)
BAB II TA FIX.pdf

Download (315kB)
[img] Text (BAB III)
BAB III TA FIX.pdf
Restricted to Repository staff only until 2028.

Download (171kB)
[img] Text (BAB IV)
BAB IV TA FIX.pdf
Restricted to Repository staff only until 2028.

Download (170kB)
[img] Text (BAB V)
BAB V TA FIX.pdf
Restricted to Repository staff only until 2028.

Download (446kB)
[img] Text (BAB VI)
BAB VI INSTRUMENTASI DAN K3.pdf
Restricted to Repository staff only until 2028.

Download (248kB)
[img] Text (BAB VII)
BAB VII TA FIX.pdf
Restricted to Repository staff only until 2028.

Download (932kB)
[img] Text (BAB VIII)
BAB VIII LOKASI DAN TAT LETAK PABRIK.pdf
Restricted to Repository staff only until 2028.

Download (416kB)
[img] Text (BAB IX)
BAB IX STRUKTUR ORGANISASI.pdf
Restricted to Repository staff only until 2028.

Download (295kB)
[img] Text (BAB X)
BAB X FIX.pdf
Restricted to Repository staff only until 2028.

Download (271kB)
[img] Text (BAB XI)
BAB XI KESIMPULAN.pdf
Restricted to Repository staff only until 2028.

Download (165kB)
[img] Text (DAFTAR PUSTAKA)
DAFPUS TA.pdf

Download (240kB)
[img] Text (APPENDIX A)
APP A FIX.pdf
Restricted to Repository staff only until 2028.

Download (436kB)
[img] Text (APPENDIX B)
APP B FIX.pdf
Restricted to Repository staff only until 2028.

Download (500kB)
[img] Text (APPENDIX C)
APP C(1) FIX_merged.pdf
Restricted to Repository staff only until 2028.

Download (2MB)
[img] Text (APPENDIX D)
APP D FIX.pdf
Restricted to Repository staff only until 2028.

Download (267kB)
[img] Text (FLOWSHEET)
FlowSheet TA.pdf

Download (268kB)

Abstract

A 1,3-butadiene plant with a capacity of 60,000 tons per year will be built in the JIPEE Industrial Area, Gresik, and will operate 24 hours a day for 330 days per year. The plant uses ethanol from PT Enero as the raw material, processed through a two-stage dehydrogenation system with chromium alumina catalyst in Reactor 1 and tantala–silica catalyst in Reactor 2. The ethanol is vaporized, heated, and fed into fixed-bed multitube reactors to first produce acetaldehyde, which is then converted into 1,3-butadiene. The reactor effluent is sent to a separator, followed by purification in two distillation columns. The first column produces 99% pure 1,3-butadiene, while the second separates water from the ethanol–acetaldehyde mixture; the water stream goes to water treatment, and the top product is recycled back to Reactor 2. The resulting 1,3-butadiene is used as a monomer in polymer and synthetic rubber industries.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSuprihatin, SuprihatinNIDN0708056303UNSPECIFIED
Thesis advisorPanjaitan, RenovaNIDN0023069502UNSPECIFIED
Subjects: T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Syaiba Qurrotul Aini
Date Deposited: 03 Nov 2025 07:29
Last Modified: 03 Nov 2025 07:29
URI: https://repository.upnjatim.ac.id/id/eprint/46009

Actions (login required)

View Item View Item