Fauzi, Abiyan Falih (2025) Peningkatan Produktivitas Melalui Pengukuran Line Balancing Pada Section Loom Menggunakan Metode Ranked Positional Weight (RPW) Di PT XYZ. Undergraduate thesis, UPN VETERAN JAWA TIMUR.
![]() |
Text (Cover)
Cover.pdf Download (1MB) |
![]() |
Text (Abstrak)
ABSTRAK.pdf Download (184kB) |
![]() |
Text (BAB 1)
BAB 1.pdf Download (270kB) |
![]() |
Text (BAB 2)
BAB 2.pdf Restricted to Repository staff only until 25 July 2027. Download (405kB) | Request a copy |
![]() |
Text (BAB 3)
BAB 3.pdf Restricted to Repository staff only until 25 July 2027. Download (256kB) | Request a copy |
![]() |
Text (BAB 4)
BAB 4.pdf Restricted to Repository staff only until 25 July 2027. Download (483kB) | Request a copy |
![]() |
Text (BAB 5)
BAB 5.pdf Restricted to Repository staff only until 25 July 2027. Download (239kB) | Request a copy |
![]() |
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Restricted to Repository staff only until 25 July 2027. Download (205kB) | Request a copy |
![]() |
Text (Lampiran)
LAMPIRAN.pdf Restricted to Repository staff only Download (787kB) | Request a copy |
Abstract
This research aims to improve productivity in the section loom area of PT XYZ through the application of line balancing using the Ranked Positional Weight (RPW) method. The main issue faced by the company is the failure to meet production targets, with monthly output achievement remaining below 80%. The initial analysis was conducted by grouping work elements into three workstations, which resulted in a line efficiency value of 58.92%, a balance delay of 41.08%, and a total idle time of 422.48 minutes. These figures indicate an imbalance in workload distribution between stations and an inefficient production flow. To address this, the work elements were regrouped into four workstations based on their positional weights using the RPW method, resulting in a more balanced workload distribution. The results showed an increase in line efficiency to 72.12%, a reduction in balance delay to 27.88%, and a decrease in idle time to 310.34 minutes. Therefore, the RPW method has proven effective in increasing production line efficiency, balancing workload distribution, and optimizing process flow, thereby supporting improvements in the company's overall productivity.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Abiyan Falih Fauzi | ||||||||
Date Deposited: | 25 Jul 2025 07:22 | ||||||||
Last Modified: | 25 Jul 2025 07:22 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/40980 |
Actions (login required)
![]() |
View Item |