Penerapan Metode Lean Maintenance Pada Mesin High Pressure Boiler Feed Pump (HP BFP) PLTGU Blok I Guna Meningkatkan Overall Equipment Effectiveness (OEE) DI PT PLN Nusantara Power UP GRESIK

Bestafirli, Aditya Aprodicto (2025) Penerapan Metode Lean Maintenance Pada Mesin High Pressure Boiler Feed Pump (HP BFP) PLTGU Blok I Guna Meningkatkan Overall Equipment Effectiveness (OEE) DI PT PLN Nusantara Power UP GRESIK. Undergraduate thesis, UPN "Veteran" Jawa Timur.

[img] Text (Cover)
21032010243-cover.pdf

Download (1MB)
[img] Text (Bab 1)
21032010243-Bab1.pdf

Download (200kB)
[img] Text (Bab 2)
21032010243-Bab2.pdf
Restricted to Repository staff only until 20 June 2027.

Download (641kB)
[img] Text (Bab 3)
21032010243-Bab3.pdf
Restricted to Repository staff only until 20 June 2027.

Download (124kB)
[img] Text (Bab 4)
21032010243-Bab4.pdf
Restricted to Repository staff only until 20 June 2027.

Download (5MB)
[img] Text (Bab 5)
21032010243-Bab5.pdf

Download (66kB)
[img] Text (Daftar Pustaka)
21032010243-daftarpustaka.pdf

Download (71kB)
[img] Text (Lampiran)
21032010243-lampiran.pdf
Restricted to Repository staff only until 20 June 2027.

Download (1MB)

Abstract

This research was conducted at PT PLN Nusantara Power UP Gresik, one of the power plants in East Java, focusing on improving the effectiveness of the High Pressure Boiler Feed Pump (HP BFP) at the Gas and Steam Power Plant (PLTGU) Block I. The main issue faced was the high level of waste in the maintenance process, which resulted in a low Overall Equipment Effectiveness (OEE) value. To address this, the Lean Maintenance method was applied in combination with Value Stream Maintenance Mapping (VSMM), Mean Time Between Failure (MTBF), Mean Time to Repair (MTTR), and Root Cause Failure Analysis (RCFA) to identify waste and design improvement proposals. The research results indicated dominant waste in the form of Unproductive Work, Delay in Motion, and Poor Inventory Management. After implementing the improvement recommendations, there was a significant increase in OEE values for each HP BFP unit: HP BFP 1A from 67% to 86%, HP BFP 1B from 52% to 86%, HP BFP 1C from 62% to 86%, and HP BFP 1D from 57% to 87%, as well as a reduction in maintenance time from 9,780 minutes to 3,300 minutes. This study demonstrates that the implementation of Lean Maintenance can enhance operational efficiency and significantly reduce machine downtime.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSaifuddin, Joumil AidilNIDN0718036203joumilaidil.ti@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TJ Mechanical engineering and machinery
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Aditya Aprodicto Bestafirli
Date Deposited: 20 Jun 2025 07:32
Last Modified: 03 Jul 2025 05:02
URI: https://repository.upnjatim.ac.id/id/eprint/38862

Actions (login required)

View Item View Item